New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4671 PBS Post bid
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2010
>
GJN4671 PBS Post bid
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 12:49:43 PM
Creation date
5/7/2010 10:24:57 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Project Budget Summary
PW_Active
No
External_View
No
GJN
004671
GL_Project_Number
905186
Retention_Destruction_Date
1/31/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r~ <br />5th and~k igh at. Storm ; -ps~a <br />Mobilization $8,000.00 <br />Traffic Control $8,000.00 <br />Erosion Control $2,000.00 <br />12" Pipe 5120.00 150 If <br />SO Manhole $2,500.00 2 ea <br />Inlet $1,800.00 2 ea <br />Site total construction cost <br />15th Agate to Moss <br />Mobilization $10,000.00. 1 Is <br />Traffic Control $3, 0.00 1 Is <br />Erosion Control $10.00 1 Is <br />15" sd pipe . $90.00 850 If <br />10" Pipe $120.00 150 If <br />SO Manhole $2,500.00 4 ea <br />4A Inlet $1,800.00 6 ea <br />Site total construction cost <br />All Sits total construction cast <br />Project Total <br />t <br />$8,000.00 <br />$3,000.00- <br />41,200.00 <br />$0.00 <br />$18,000.00 <br />$5,000.00 <br />$3,600.00 <br />_538,800.00 <br />$10,000.00. <br />$3,000.00 <br />$1,200.00 <br />$76,500.00 <br />$18,000.00 <br />$10,000.00 <br />510,800.00 <br />$129,500A~ <br />I $257,450.00 <br />$362,187.50 <br />
The URL can be used to link to this page
Your browser does not support the video tag.