New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4582 Eugene Sand Gravel
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2010
>
GJN4582 Eugene Sand Gravel
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 11:33:16 AM
Creation date
5/7/2010 10:24:56 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004582
GL_Project_Number
995344
COE_Contract_Number
2010-00019
Retention_Destruction_Date
8/12/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ANNUAL CONSTRUCTION SITE MANAGEMENT PLAN <br />FOR <br />City of Eugene Pavement Projects <br /> <br />Background: <br />City of Eugene Capitol Improvement Overlay Projects is designed to replace and repair public . <br />ways and facilities. Many of these areas are located in sensitive areas that require erosion <br />prevention and control measures to meet R-6.645-D (Outcomes). Sensitive areas are defined as <br />slopes of 10% or greater, soils that are highly erodable, and/or the construction area drains into <br />or is adjacent to a water feature including roadside ditches. Projects vary in size and location, but <br />are generally approached in the same manner as outlined below. <br />In general, these projects consists of cold plane pavement removal of asphalt concrete, full depth. <br />removal/replacement of existing asphalt concrete pavement as needed, an asphalt concrete <br />overlay, median island modifications, traffic signal loops and conduits. <br />Erosion Prevention and Construction Site Management Practices <br />Prior to any ground disturbance on the site one inspection with the Erosion Prevention staff is <br />required. A CSMP will be developed and attached or incorporated info the bid documents. <br />Issuance of the erosion prevention permit does not relieve the permit holder and or the contractor <br />from all other permitting requirements. Prior to beginning construction activities, all other <br />necessary approvals shall be obtained. <br />Construction shall conform to the City of Eugene Standard Specifications as amended. <br />Wet Weather Season (October 15th to April 30th) <br />During wet weather season additional Best Management Practices (BMP'S) shall be installed to <br />ensure that all outcomes are being met. Permanent stabilization of all exposed sails during the <br />wet weather period shall occur within 24 hours of final grade. To insure that sediment and <br />sediment-laden water do not enter rivers, drainage systems, storm systems, roadways, or violate <br />applicable water standards. Measures may include immediate clean up of all sediment and debris <br />from the public right of way, street sweeping, and coverage of all exposed soil at the end of <br />every Work shift. <br />Special Specifications - Job #4582 Page 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.