New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4582 Eugene Sand Gravel
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2010
>
GJN4582 Eugene Sand Gravel
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 11:33:16 AM
Creation date
5/7/2010 10:24:56 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004582
GL_Project_Number
995344
COE_Contract_Number
2010-00019
Retention_Destruction_Date
8/12/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(ADD) The following items of Work will be constructed in the following order: <br />1. Manhole adjustments <br />2. Permanent striping <br />3. Traffic loop detectors <br />(ADD) Pavement repairs at *0+2&M 11+30~in the north and southbound lanes, 48+55."`-y <br />48511i°n the"rYOrthbound-lane and +10 52+40-fn4he northbound lane may be <br />completed prior to pavement removal. All other pavement repairs shown on the <br />plans will be determined in the field after the contractor has planed the surface. <br />00180.41 Project Work Schedules <br />(Add) A Type A schedule as detailed in the specifications is required on this Contract. <br />00180.50 Contract Time to Complete Work. <br />(h) Contract Time <br />(ADD) When work begins, (with the exception of installing PCMS and City Provided <br />Special Signs) thirty (30) calendar days will be allowed for the completion of all <br />work. <br />Work shall not begin before July 6, 2010. All work shall be completed no later <br />than September 10, 2010. <br />00180.85 Failure to Complete on Time; Liquidated Damages <br />(b) Liquidated Damages <br />(ADD) When cold planed surfaces within the traveled way are not paved within the time <br />period after cold plane operations identified in the Standard Specifications in <br />Subsection 00620.43, "Maintenance Under Traffic", or these Special Provisions, <br />liquidated damages, in the amount of $400.00, shall be assessed for each Work <br />day in excess of the specified time period. Liquidated damages assessed for <br />failure to pave cold planed surfaces within the traveled way after cold planing <br />within the specified time period will be in addition to liquidated damages <br />assessed for failure to complete the contract on time. <br />If weekend or holiday work is approved by the engineer, work performed on <br />weekends or holidays beyond the Contract Time or the completion date, <br />whichever comes first, will be charged as Work days and assessed liquidated <br />damages. <br />Liquidated damages in the amount of $400.00 per Work day will be assessed for <br />each Work day beyond the Contract Time or the completion date, whichever <br />comes first, that the work is not complete. <br />00195.13 Asphalt Cement Material Price Escalation/De-Escalation Clause <br />(ADD) Replace "HMAC" with "WMAC" where referenced in 00195.13 and its sub- <br />sections. <br />Special Specifications - Job #4582 Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.