Run Date: 04/23/2010 09:11:31 <br />City of Eugene <br />Estimate Distributi <br />on <br />Estimate: <br />PPP Oakway - ES <br />Job <br />93-004655 PPP OAKWAY RD-CAL YOUNG RD TO FAIRWAY <br />LOOP <br />Line No. Description <br />Quantity <br />Unit <br />Unit Price <br />Amount <br />PPP OAKWAY RD-CAL YOUNG RD TO FAIRWAY LOOP <br />General <br />0520. <br />MOBILIZATION <br />1.00 <br />LUMPSUM <br />$7,500.00 <br />$7,500.00 <br />0530. <br />TEMP. WORK ZONE TRAFFIC CONTROL, COMPLETE <br />1.00 <br />LUMPSUM <br />$7,500.00 <br />$7,500.00 <br />0540. <br />TEMPORARY STRIPING <br />1.00 <br />LUMPSUM <br />$3,600.00 <br />$3,600.00 <br />0550. <br />PORTABLE CHANGEABLE MESSAGE SIGNS <br />60.00 <br />DAY <br />$50.00 <br />$3,000.00 <br />0560. <br />FLAGGERS <br />500.00 <br />HOUR <br />$46.00 <br />$23,000.00 <br />0570. <br />CITY PROVIDED SPEC INFO SIGNS <br />4.00 <br />EACH <br />$200.00 <br />$800.00 <br />0580. <br />EROSION CONTROL <br />1.00 <br />LUMPSUM <br />$1,000.00 <br />$1,000.00 <br />0590. <br />CWM PLAN/SUMMARY <br />2.00 <br />EACH <br />$100.00 <br />$200.00 <br />0600. <br />REMOVE PIPE <br />103.00 <br />FOOT <br />$5.00 <br />$515.00 <br />0610. <br />10" INCH 0900 PIPE <br />103.00 <br />FOOT <br />$110.00 <br />$11,330.00 <br />0620. <br />ADJUSTING BOXES <br />24.00 <br />EACH <br />$250.00 <br />$6,000.00 <br />0630. <br />MINOR ADJUSTMENT OF MANHOLES <br />15.00 <br />EACH <br />$1,200.00 <br />$18,000.00 <br />0640. <br />MH FRAME/COVER-ST <br />12.00 <br />EACH <br />$270.00 <br />$3,240.00 <br />0650. <br />MH FRAME/COVER-WW <br />2.00 <br />EACH <br />$270.00 <br />$540.00 <br />0660. <br />COLD PLANE PVMT REMOVAL, 3" DEEP <br />98,700.00 <br />SQFT <br />$0.17 <br />$16,779.00 <br />0670. <br />SEAL COAT <br />9,620.00 <br />SQYD <br />$1.35 <br />$12,987.00 <br />0680. <br />LEVEL 3, 1/2" DENSE WMAC <br />1,840.00 <br />TON <br />$55.00 <br />$101,200.00 <br />0690. <br />PAVEMENT REMOVAL <br />105.00 <br />SQFT <br />$3.00 <br />$315.00 <br />0700. <br />ASPHALT CONCRETE PAVEMENT REPAIR <br />40.00 <br />CUYD <br />$125.00 <br />$5,000.00 <br />0710. <br />CONCRETE CURB <br />16.00 <br />FOOT <br />$13.00 <br />$208.00 <br />0720. <br />CONCRETE CURB AND GUTTER <br />40.00 <br />FOOT <br />$32.00 <br />$1,280.00 <br />0730. <br />CONCRETE WIDE CURB AND GUTTER <br />30.00 <br />FOOT <br />$55.00 <br />$1,650.00 <br />0740. <br />TRUNCATED DOME TEXTURING <br />8.00 <br />SQFT <br />$15.00 <br />$120.00 <br />0750. <br />CONCRETE WALK, 4" THICK <br />170.00 <br />SQFT <br />$7.00 <br />$1,190.00 <br />0760. <br />PVMT LEGEND, TYPE B: ARROWS <br />4.00 <br />EACH <br />$275.00 <br />$1,100.00 <br />0770. <br />PVMT LEGEND, TYPE B: BICYCLE LANE SYMBOLS <br />10.00 <br />EACH <br />$250.00 <br />$2,500.00 <br />0780. <br />PVMT BAR, TYPE B <br />114.00 <br />SQFT <br />$8.00 <br />$912.00 <br />0790. <br />MONO-DIRECTIONAL CRYSTAL TYPE I MARKERS <br />25.00 <br />EACH <br />$5.00 <br />$125.00 <br />0800. <br />BI-DIRECTIONAL YELLOW TYPE I MARKERS <br />215.00 <br />EACH <br />$5.00 <br />$1,075.00 <br />0810. <br />THERMOPLASTIC, NON-PROFILE, 90 MIL, EXTRUDED <br />1.00 <br />LUMPSUM <br />$14,500.00 <br />$14,500.00 <br />0820. <br />LOOP DETECTORS INSTALLATION <br />8.00 <br />EACH <br />$550.00 <br />$4,400.00 <br />0830. <br />CONDUIT UNDER HARD SURFACING <br />80.00 <br />FOOT <br />$70.00 <br />$5,600.00 <br />0840. <br />JUNCTION BOX, TYPE 1 <br />1.00 <br />EACH <br />$350.00 <br />$350.00 <br />Total <br />General <br />$257,516.00 <br />Total : PPP <br />OAKWAY RD-CAL YOUNG RD TO FAIRWAY LOOP <br />$257,516.00 <br />PPP OAKWAY RD-CAL YOUNG RD TO FAIRWAY LOOP - Other / Direct <br />General <br />0010. <br />test <br />2% of Contract <br />$5,150.32 <br />0020. <br />Contingency <br />10% of Contract <br />$25,751.60 <br />0030. <br />Printing <br />1.00 <br />LUMPSUM <br />$250.00 <br />$250.00 <br />0040. <br />Advertising <br />1.00 <br />LUMPSUM <br />$500.00 <br />$500.00 <br />0050. <br />BOLI PW FEE <br />0.1% of Contract <br />$257.52 <br />Total : <br />General <br />$31,909.44 <br />Total : PPP <br />OAKWAY RD-CAL YOUNG RD TO FAIRWAY LOOP - Other / <br />Direct <br />$31,909.44 <br />PPP OAKWAY RD-CAL YOUNG RD TO FAIRWAY LOOP - Miscellaneous <br />General <br />0010. <br />Engineering Charge <br />21% of Direct <br />$60,779.34 <br />0020. <br />AS-CONST. 11MONTH WARRANTY CHARGE <br />1.00 <br />LUMPSUM <br />$1,200.00 <br />$1,200.00 <br />Total : <br />General <br />$61,979.34 <br />Total : PPP <br />OAKWAY RD-CAL YOUNG RD TO FAIRWAY LOOP - Miscellaneous <br />$61,979.34 <br />Total : PPP Oakway - ES $351,404.78 <br />