New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4613 Elms Landscape 2010-00017
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2010
>
GJN4613 Elms Landscape 2010-00017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 12:24:14 PM
Creation date
4/1/2010 10:19:33 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004613
GL_Project_Number
995522
COE_Contract_Number
2010-00017
Retention_Destruction_Date
12/2/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
004,05.80 Measurement <br />(REVISE) Except for Bedding & Pipe Zone Material and Imported Class A Backfill no separate <br />measurement of quantities will be made for work performed under this Section. <br />(ADD) 00405.83 Bedding & Pipe Zone Material - The quantity of bedding and pipe zone <br />material installed will be measured on the weight basis. The quantity of material will be <br />based on weigh tickets from scales meeting the requirements of Section 00190. Present <br />weigh tickets to the Project Inspector for signature on the day the material is delivered. <br />Removal and disposal excess and/ or unsuitable materials (deleterious materials, <br />organic matter, etc.) shall be incidental to this work. <br />(ADD) 00405.84 Imported Class A Backfill - The quantity of imported Class A backfill will be <br />measured on the weight basis. The quantity of material will be based on weigh tickets <br />from scales meeting the requirements of Section 00190. Present weigh tickets to the <br />Project Inspector for signature on the day the material is delivered. Removal and <br />disposal of excess and/ or unsuitable materials (deleterious materials, organic matter, <br />etc.) shall be incidental to this work. <br />00405.90 Payment <br />(REVISE) The accepted quantities of Bedding & Pipe Zone Material and Imported Class A Backfill <br />will be paid for at the Contract unit price, per unit of measurement, for the following items: <br />Pay Item Unit of Measurement <br />(a) Bedding & Pipe Zone Material Ton <br />(b) Imported Class A Backfill Ton <br />Items include removal of excess and/ or unsuitable material and replacement as <br />required. <br />Payment will be payment in full for furnishing and installing all materials, and for furnish <br />all equipment, labor, and incidentals necessary to complete the work as specified. <br />No separate or additional payment will be made for: <br />• Trench excavation <br />• Dewatering <br />• Pipe bedding with onsite material that is acceptable <br />• Pipe zone with onsite material that is acceptable <br />• Trench backfill with onsite material that is acceptable <br />Saw cutting <br />Concrete replacement <br />Trench Protection <br />01120.45 Pipe Bedding <br />(ADD) Pipe bedding material referenced in this section shall meet the requirements of Section <br />405. <br />01120.58 Backfill <br />(ADD) To second paragraph: Pipe zone material as described in this paragraph shall meet the <br />requirements of Section 405. <br />Addendum #2 - Job #4613 Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.