New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4613 Elms Landscape 2010-00017
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2010
>
GJN4613 Elms Landscape 2010-00017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 12:24:14 PM
Creation date
4/1/2010 10:19:33 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004613
GL_Project_Number
995522
COE_Contract_Number
2010-00017
Retention_Destruction_Date
12/2/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Public Works <br />Engineering <br />ADDENDUM NO. 2 <br />City of Eugene <br />99 East Broadway, Suite 400 <br />Eugene, Oregon 97401 <br />(541) 682-5560 <br />(541) 682-8410 FAX <br />TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS FOR <br />ALTON BAKER PARK - IRRIGATION AND UTILITY IMPROVEMENTS <br />LOCATED AT 200 DAY ISLAND ROAD <br />MARCH 3, 2010 JOB #4613 BID NUMBER 10 <br />TO ALL PLANHOLDERS: <br />The following changes shall amend and supplement the project bidding documents only to the extent <br />specifically shown and noted. All other conditions shall remain the same. <br />Bidders shall incorporate the effects of these changes in the appropriate. bid items included in this <br />addendum and the total of these bid items then add in the appropriate place on the bid form. <br />CHANGES TO BID SCHEDULE: <br />(DELETE) Original Bid Schedule dated 2/10/2010 <br />(ADD) Revised Bid Schedule dated 3/03/2010 <br />CHANGES TO SPECIAL PROVISIONS: <br />00120.15 Examination of Work Site and Solicitation Documents; Consideration of <br />Conditions Encountered <br />(Add) Pre-bid Conference Attendance sign-in sheet, provided for Bidders reference. <br />00130.50(b) Execution of Contract and Bonds (By the Agency) <br />(Replace) 10 Calendar Days with; 5 Calendar Days. <br />00405.14(a) Class A Backfill <br />(ADD) If, in the opinion of the Engineer, native or common material is unsuitable provide <br />Imported Class A Backfill consisting of unscreened clean fill soil/ bank loam meeting the <br />general requirements of 01040.14 with no particle size larger than 2" size. Submit <br />sample for approval prior to import. <br />00405.46(c)(1) General <br />(ADD) If, in the opinion of the Engineer, onsite Class A material is unsuitable furnish Imported <br />Class A Backfill. Removal and disposal of unsuitable materials shall be incidental. <br />Addendum #2 - Job #4613 Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.