New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4613 Contract 2010-00231 Amend #1
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2010
>
GJN4613 Contract 2010-00231 Amend #1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 12:24:14 PM
Creation date
3/25/2010 3:24:27 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004613
GL_Project_Number
995522
Identification_Number
20100050221
COE_Contract_Number
2010-00231
Retention_Destruction_Date
12/2/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Cityof Eugene Contract #2010-00231 <br />Amendment One <br />Exhibit A - Scope of Work <br />City of Eugene February 10, 2010 <br />Alton Baker Park Irrigation & Utility Improvements <br />Additional Services - Electrical <br />A. Additional Services Description: <br />The existing electrical service at Alton Baker Park does not have sufficient capacity to feed the <br />proposed loads. A new electrical service will be required. Provisions for upgrading the electrical <br />service were specifically excluded from our scope of work in our fee proposal. The following is a <br />description of our scope work and additional fees to provide a new electrical service for this project. <br />B. Detailed Task List: <br />Construction Documents Phase: <br />a. Meetings: <br />1) Owner and EWEB at the site (1) <br />b. Coordination with EWEB <br />c. Electrical system design completion <br />1) Utility coordination <br />2) Service calculations <br />d. Drawing production <br />a) Red-line Drawings <br />b) Specification notes on the drawings <br />2. Bid/Construction Phase: <br />a. Answer questions during bidding & construction; provide supplemental information <br />(BFI's, IB's) <br />b. Submittal review <br />c. Progress meetings and inspections (1) <br />d. Final inspection (1) <br />C. Fee Summary <br />BHE will provide the above-defined services for an hourly not to exceed amount shown below. <br />Reimbursable expenses will be billed at cost plus ten (10) percent and are not included in the <br />maximum fee. <br />1. <br />Construction Documents <br />$ <br />3,000 <br />2. <br />Construction Administration <br />$ <br />500 <br />3. <br />TOTAL <br />$ <br />3,500 <br />Reimbursable Expense Budget Cost + 10%* <br />* Reimbursable expenses include document reproduction, and mail/delivery charges <br />Salzhiser & Hubbard Engineers PROPOSAL - ELECTRICAL- PAGE 1 <br />i ME ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.