Cityof Eugene Contract #2010-00231 <br />Amendment One <br />Exhibit A - Scope of Work <br />City of Eugene February 10, 2010 <br />Alton Baker Park Irrigation & Utility Improvements <br />Additional Services - Electrical <br />A. Additional Services Description: <br />The existing electrical service at Alton Baker Park does not have sufficient capacity to feed the <br />proposed loads. A new electrical service will be required. Provisions for upgrading the electrical <br />service were specifically excluded from our scope of work in our fee proposal. The following is a <br />description of our scope work and additional fees to provide a new electrical service for this project. <br />B. Detailed Task List: <br />Construction Documents Phase: <br />a. Meetings: <br />1) Owner and EWEB at the site (1) <br />b. Coordination with EWEB <br />c. Electrical system design completion <br />1) Utility coordination <br />2) Service calculations <br />d. Drawing production <br />a) Red-line Drawings <br />b) Specification notes on the drawings <br />2. Bid/Construction Phase: <br />a. Answer questions during bidding & construction; provide supplemental information <br />(BFI's, IB's) <br />b. Submittal review <br />c. Progress meetings and inspections (1) <br />d. Final inspection (1) <br />C. Fee Summary <br />BHE will provide the above-defined services for an hourly not to exceed amount shown below. <br />Reimbursable expenses will be billed at cost plus ten (10) percent and are not included in the <br />maximum fee. <br />1. <br />Construction Documents <br />$ <br />3,000 <br />2. <br />Construction Administration <br />$ <br />500 <br />3. <br />TOTAL <br />$ <br />3,500 <br />Reimbursable Expense Budget Cost + 10%* <br />* Reimbursable expenses include document reproduction, and mail/delivery charges <br />Salzhiser & Hubbard Engineers PROPOSAL - ELECTRICAL- PAGE 1 <br />i ME ' <br />