Brookside Quick Estimate <br />#4694 #4589 <br />MOB <br />Erosion <br />Traffic <br />Force accnt <br />Rock <br />fabric <br />Flex pipe <br />Liner pipe <br />Vegetation <br />Sub Total <br />Total <br />$ <br />91000.00 <br />$ <br />2,000.00 <br />$ <br />4,500.00 <br />$ <br />500.00 <br />$ <br />2,000.00 <br />$ <br />2,000.00 <br />$ <br />7,500.00 <br />$ <br />5,000.00 <br />$ 6,000.00 <br />$ 2,500.00 <br />$ - $ 750.00 <br />$ 31,200.00 6501f@$481f <br />$ 6,000.00 <br />$ 37,500.00 $ 41,450.00 <br />$ 78,950.00 <br />*Much of this project may occur through Project #4589 Managed by <br />David Starns. His project is about to go to bid and focuses on pipe lining <br />for waste water. We would anticiate that once he recieves bids. That we <br />would transfer Storm water Utilities funding (531) to that project to <br />cover the cost of this work. Current work would include lining the pipe, <br />clearing the outfall and connecting a flexible (black) pvc pipe to the end <br />and extend it to the lower reaches of the slope where rock stabilization <br />exist. We would then come in and do bank stablization in the dryer <br />months of August or September. <br />