02/24/2010 13:22 FAX 541 682 5366 CITY EUGENE PW ENG -j WILDISH CONST 14006/01po <br />(ADD) The base bid includes reinstallation of the existim,, centerline h0ht fixtures dUrinir the PClinnal'y <br />00SUi'e period In June. If the: additive allernate is awarded to provide and install tine nev, centerline <br />110114 fixtures. BOTH the base bid and the additive alternate will be paid. <br />(:ADD) The bid item for "New Centerline I..ight FiYtUres and "New Iso rransformers" includes 1.0 <br />Spare units ofeach, to be delivered to the Engineer. <br />(ADD) The bid item for "New lit-Pavement Edge Light Fixtures". Includes the lncw isolation <br />transformer. <br />5.1 [BASIS OF PAYE INT (Rum vay Weather Information Systent), Pg. 202 <br />(DELETE) In the first sentence, delete the phrase "and pavement sensor cable shall be maid by the <br />linear foot price. for Sensor Cable." <br />CHANCES TO PLAN SHEETS: <br />Sheet 2 <br />(DELETE) The note *,Reconstruct leaved Access Road upon completion" <br />Sheet C-5 <br />(CHANGE) Bubble notes oil Taxiway lights 338A and 339A to ".IB-D-N`*. <br />Sheet D-3 <br />(CLARIFICATION): Electrical Note 2 oil Sheet D-3 was deleted by Addendum 2 because there are <br />no details for L-867 cans on that sheet. <br />(ADD) Sheet E-3 ADDENDUM #3 2/24/2010 <br />If you have questions about this addendum or the project. please call Teri Higgins at (541) 682-8462. <br />All bidders shall acknowledge the receipt or and acceptance of this Addendum No. 3 by signing and <br />submitting the signed Addendum with the bid. Kids submitted without this Addendum, or with the <br />Addendum not signed, will be considered informal. <br />City Engineer <br />Receipt acknowledged and conditions agreed <br />this 24 day of FEBRUARY . 2010. <br />Bidder: WILDISH CONSTRUCTION CO. <br />BY: <br />Addendunn #3 Job 4462.5 Page 5 <br />