New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4625 Wildish 2010-00016
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2010
>
GJN4625 Wildish 2010-00016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 12:29:15 PM
Creation date
3/22/2010 10:05:51 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004625
GL_Project_Number
995884
COE_Contract_Number
2010-00016
Retention_Destruction_Date
6/1/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
02/24/2010 13:21 FAX 541 682 5366 CITY EUGENE PW ENG 4 WILDISH CONST 141 003/01po <br />70-13 OPENING SECTIONS O THE WORK To "I'Ia AFFIC (Legal Regulations and <br />Responsibility to Public), Pg. 26 <br />(CHANGE) .tune 7.1-010 to .Trine 1, 2010. <br />80-03 PROSECUTION AND PROGRESS (Prosecution and Progress), Pg. -10 <br />(DELETE) 1~rom. the second paragraph "The schedule. when approved. will be the basis for <br />(ictcltninnig. the necessity of contract tillle extensions due to weather delays. Contract time extensions <br />will be determined by the hour, and will only be grained specific item of work identified on the <br />original approved schedule, that is currently on schedule, cannot be completed dale to weather. " <br />80-07 CONTRACT I' TIME (Prosecution and Progress), Pg. 33 <br />(CHANGE) June 7, 1-010 to June 1. 2010 (three instances) <br />80-07 a. (1) (Contract tulle- Prosecution and Progress), Pg. 33 <br />(DELETE) "No time shall be charge(] for hours on which the Contractor is unable to proceed with an <br />item of work indicated on the approved schedule to be currently on-tune but the contractor Is unable to <br />proceed due to weather. For example: If the surface course is scheduled to commence at 0700 on June <br />15, 2010 and the contractor is completely prepared for that work item, but it is raining, a contract time <br />extension will be granted. ` <br />80-08 FAILURE TO COMPLETE ON TIME (Prosecution and Progress), P g. 35 <br />(CHANGE) The Priin<iry Runway Closure Liquidated Daloiages from S lOOO./hoLU- to S50(')O/Ioour, and <br />the Allowed Construction'Time from June 7 to JLine 1. 2010. <br />90-06 PARTIAL PAYMENTS (Measurement and Payment), Pg. 40 <br />(ADD) One additional partial progress paNrnent shall be made for work completed between May 26. <br />2010 and June 15, 2010, up to a maximuni of $2,500,000,00. The, check for this work will be available <br />the week of June 28. 2010. <br />100-01 GENERAL (Contractor Quality Control Prograin), Pg. 42 <br />(DELETE) Delete the last sentence. <br />(ADD) Acceptance testing shall be performed as specified in the technical specifications. <br />ACCESS 1.0 THE AC;IA (Construction Operations Plan), Pg. 55 <br />(DELETE) The last two sentences. <br />Security Badges (Construction (Operations Plan), Pg. 55 <br />(ADD) Subcontractor's who are on-site less than 30 hours maybe exempted from this requirement as <br />approved by the airport. <br />Addendum 43 - Job #4625 Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.