New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4625 Wildish 2010-00016
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2010
>
GJN4625 Wildish 2010-00016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 12:29:15 PM
Creation date
3/22/2010 10:05:51 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004625
GL_Project_Number
995884
COE_Contract_Number
2010-00016
Retention_Destruction_Date
6/1/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
02/24/2010 13:21 FAX 541 682 5366 CITY EUGENE PW ENG 4 WILDISH CONST <br />Public Works <br />Engineering <br />Ij002/01po <br />City of Eugene <br />99 East Broadway, Suite 400 <br />Eugene, Oregon 97401 <br />(541) 682-5560 <br />(541) 682-8410 FAX <br />ADDENDUM NO. 3 <br />TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS FOR <br />EUGENE AIRPORT REHAB OF RUNWAY 16R/34L <br />AI P 3-41-0018-45 <br />FEBRUARY 24.2010 JOB #4625 BID NUMBER 2 <br />TO ALL. PLANTIOLDERS <br />The fbilowing changes shall amend and supplenlent the project bidding documents only to the extent <br />specifically shown and noted. All other conditions shall remain the same <br />Bidders shall incorporate the effects of these changes in the appropriate bid items included in this <br />addendum and the total of these bid items then add in the appropriate place on the bid form. <br />CHANGES TO INVITATION FOR SIDS & PROPOSAL.: <br />FROM: Tuesday. March 2, 2010 2:00 Plot <br />TO: Thursday, March 4, 2010 2:00 PM <br />CHANGES TO BID SCHEDULE: <br />(DELETE) Original Bid Schedule dated 02.10112010 <br />(ADD) Revised Bid Schedule dated 02/23;`20 10 <br />CHANGES TO PROVISIONS AND SPECIFICATIONS <br />30-01 CONSIDERATION OF PROPOSALS (Award and Execution of Contract) Pg. 9 <br />(DELE'T'E) The second paragraph. <br />(ADD) The low bidder, for the purposes of award, shall be the responsive bidder offering the low <br />aggregate amount for the base bid item, plus additive alternates selected by tide owner in the order <br />listed on the bid schedule, and within the funds available For tine project. <br />50-15 'FINAL ACCEPTANCE (Control of Work), Pg 20 <br />(ADD) Work completed, accepted and put into operation upon completion of the Primary Closure <br />Period will be put on warranty upon opening of the runway. A second warranty period will begin upon <br />project completion for those items constructed after the Primary Closure Period. <br />Addendum f 3 ..Job #462 Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.