02/24/2010 13:21 FAX 541 682 5366 CITY EUGENE PW ENG 4 WILDISH CONST <br />Public Works <br />Engineering <br />Ij002/01po <br />City of Eugene <br />99 East Broadway, Suite 400 <br />Eugene, Oregon 97401 <br />(541) 682-5560 <br />(541) 682-8410 FAX <br />ADDENDUM NO. 3 <br />TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS FOR <br />EUGENE AIRPORT REHAB OF RUNWAY 16R/34L <br />AI P 3-41-0018-45 <br />FEBRUARY 24.2010 JOB #4625 BID NUMBER 2 <br />TO ALL. PLANTIOLDERS <br />The fbilowing changes shall amend and supplenlent the project bidding documents only to the extent <br />specifically shown and noted. All other conditions shall remain the same <br />Bidders shall incorporate the effects of these changes in the appropriate bid items included in this <br />addendum and the total of these bid items then add in the appropriate place on the bid form. <br />CHANGES TO INVITATION FOR SIDS & PROPOSAL.: <br />FROM: Tuesday. March 2, 2010 2:00 Plot <br />TO: Thursday, March 4, 2010 2:00 PM <br />CHANGES TO BID SCHEDULE: <br />(DELETE) Original Bid Schedule dated 02.10112010 <br />(ADD) Revised Bid Schedule dated 02/23;`20 10 <br />CHANGES TO PROVISIONS AND SPECIFICATIONS <br />30-01 CONSIDERATION OF PROPOSALS (Award and Execution of Contract) Pg. 9 <br />(DELE'T'E) The second paragraph. <br />(ADD) The low bidder, for the purposes of award, shall be the responsive bidder offering the low <br />aggregate amount for the base bid item, plus additive alternates selected by tide owner in the order <br />listed on the bid schedule, and within the funds available For tine project. <br />50-15 'FINAL ACCEPTANCE (Control of Work), Pg 20 <br />(ADD) Work completed, accepted and put into operation upon completion of the Primary Closure <br />Period will be put on warranty upon opening of the runway. A second warranty period will begin upon <br />project completion for those items constructed after the Primary Closure Period. <br />Addendum f 3 ..Job #462 Page 1 <br />