New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4625 Wildish 2010-00016
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2010
>
GJN4625 Wildish 2010-00016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 12:29:15 PM
Creation date
3/22/2010 10:05:51 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004625
GL_Project_Number
995884
COE_Contract_Number
2010-00016
Retention_Destruction_Date
6/1/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
02/19/2010 16:25 FAX 541 682 5366 CITY EUGENE PW ENG WILDISH CONST 0002/01po <br />Public Works <br />Engineering <br />City of Eugene <br />99 East Broadway, Suite 400 <br />Eugene, Oregon 97401 <br />(541) 682-5560 <br />(541) 682-8410 FAX <br />ADDENDUM NO. 2 <br />TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS FOR <br />EUGENE AIRPORT REHAB OF RUNWAY 1611/34L <br />AIP 3-41-0018-45 <br />FEBRUARY 19, 2010 JOB #4625 BID NUMBER 2 <br />TO ALL PLANHOLD.ERS: <br />The following changes shall amend and supplement the project bidding documents only to the extent <br />specifically shown and noted. All other conditions shall remain the same. <br />Bidders shall incorporate the effects of these changes in the appropriate bid items included in this <br />addendum and the total of these bid items then add in the appropriate place on the bid form. <br />CHANGES TO PROVISIONS AND SPECIFICATIONS <br />PART I - GENERAL PROVISIONS <br />50-06 CONSTRUCTION LAYOUT AND STAKES <br />Additional Requirements g. (page 17) <br />(ADD) Final as-constructed drawings by the surveyor shall include the finished grade elevation down <br />the centerline of each paving lane. and rim & flowline information of all new storm structures. <br />90-07 PAYMEN'T' FOR MATERIALS ON HAND (page 40) <br />(ADD) Payment for materials oil hand will only be made for materials delivered to the Airport and <br />stored at the location shown on the plans. <br />T'ART II - SPECIAL PROVISIONS <br />MOBILIZATION/DEMOBILIZATION (page 65) <br />2.2 <br />(ADD) The Contractor will be required to relocate floodlight units to the work areas as needed. Light <br />units will only be ordered by the Engineer if all units are being utilized to the fullest extent. <br />2.3 <br />(ADD) The lighted closure crosses run on either Diesel or Bio-Diesel. The fuel tank holds 15 gallons <br />and lasts approximately 20 hours. <br />Addendum #2 - Job #4625 Page ] <br />
The URL can be used to link to this page
Your browser does not support the video tag.