ROOFER (Continued) <br />Add $3.00 to basic hourly rate for employees <br />working with irritable bituminous materials <br />SHEET METAL WORKER <br />Area 1 34.42 16.95 <br />Add $1.00 to base rate for work performed on any <br />swinging platform, swinging chair or swinging <br />ladder. <br />Add $1.00 to base rate for work with lead or <br />installing, material in a plant that uses lead in any <br />form to manufacture a product (excluding <br />soldering). <br />Add $1.00 to base rate for work performed in a <br />confined space as defined by OSHA. <br />Area 3 29.71 15.00 <br />Add $1.00 to base rate for work where it is <br />necessary to wear a chemically activated face <br />mask. <br />Area 4 <br />30.00 15.12 <br />Area 5 <br />28.63 15.89 <br />Area 1 <br />Area 1 (Cont.) <br />Area 5 <br />Benton <br />Washington <br />Coos <br />Clackamas <br />Wheeler <br />Curry <br />Clatsop <br />Columbia <br />Area 3 <br />Gilliam <br />Morrow <br />Grant <br />Umatilla <br />Lincoln <br />Linn <br />Area 4 <br />Multnomah Douglas <br />Tillamook Lane <br />SOFT FLOOR LAYER 25.83 <br />10.85 <br />SPRINKLER FITTER 33.25 <br />16.55 <br />TENDERS TO MASON TRADES <br />(Brick and <br />Stonemason, Mortar Mixer, Hod Carrier) <br />25.14 <br />11.00 <br />Add $0.50 to base rate for refractory work. <br />TENDERS TO MASON TRADES (Brick and <br />Stonemason, Mortar Mixer, Hod Carrier) <br />(Continued) <br />Add to base rate an amount equal to that received for <br />safety belt requirements or other unusual job <br />conditions by the mechanic this worker is tending. <br />TENDER TO PLASTERER AND STUCCO <br />MASON <br />23.62 11.00 <br />TILE SETTER/TERRAZZO WORKER: Hard Tile <br />Setter 27.68 12.90 <br />(This trade is tended by "Tile, Terrazzo, & Marble <br />Finisher") <br />TILE. TERRAZZO. AND MARBLE FINISHER <br />TILE TERRAZZO FINISHER <br />21.11 9.50 <br />BRICK AND MARBLE FINISHER <br />21.11 9.60 <br />Add $1.00 to base rate if safety belt required by State <br />safety regulations. <br />Add $1..00 to base rate if work involves epoxy, <br />furnane, alkor acetylene black grouting or waterproof <br />membrane. <br />TRUCK DRIVER <br />Group 1 <br />26.90 <br />12.75 <br />Group 2 <br />27.02 <br />12.75 <br />Group 3 <br />27.15 <br />12.75 <br />Group 4 <br />27.41 <br />12.75 <br />Group 5 <br />27.63 <br />12.75 <br />Group 6 <br />27.79 <br />12.75 <br />Group 7 <br />27.99 <br />12.75 <br />(Zone Pay in addition to Basic Hourly Rate and <br />Fringe.) <br />For the Following Cities: <br />Albany <br />Grants Pass <br />Ontario <br />Astoria <br />Hermiston <br />Oregon City <br />Baker <br />Hood River <br />Pendleton <br />Bend <br />Klamath Falls <br />Portland <br />Bingen <br />LaGrande <br />Port Orford <br />Brookings <br />Lakeview <br />Reedsport <br />Burns <br />Longview <br />Roseburg <br />JULY 1, 2009 PAGE 44 APPENDIX <br />