New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4378 Imonen Sculpture
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2010
>
GJN4378 Imonen Sculpture
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2014 1:47:18 PM
Creation date
2/19/2010 10:33:57 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
Yes
External_View
No
GJN
004378
GL_Project_Number
965132
Identification_Number
2010-00238
COE_Contract_Number
2010-00238
Retention_Destruction_Date
4/19/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Work will not require procedures substantially in excess of those described in the <br />maintenance recommendations submitted by Contractor to the City. <br />15. Contractor shall ship the Work to City in accordance with dates specified in agreed upon <br />timeline. Works shall be shipped to City, packaged to withstand normal transportation <br />handling and installation activities. Works not adequately protected or damaged in <br />transit shall be replaced or repaired at no cost to the city. <br />16. Contractor shall provide all material, labor and transportation costs associated with the <br />Work. Contractors shall also include all other expenses associated with fabrication of <br />the Work, including but not limited to long distance telephone calls, FAX, postage, <br />reproductions, mailing, travel, meals and lodging. <br />
The URL can be used to link to this page
Your browser does not support the video tag.