New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
4J Inv Athletic Field Sp Butte & Jefferson MS Inv 1/28/2009
COE
>
PW
>
POS_PWM
>
AP
>
4J Inv Athletic Field Sp Butte & Jefferson MS Inv 1/28/2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2011 8:27:04 AM
Creation date
12/18/2009 4:55:25 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Invoices-Payments & Receivables
PW_Active
Yes
External_View
No
GJN
N/A
GL_Project_Number
975232
Identification_Number
Invoice 1/28/2009
COE_Contract_Number
2008-01033
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AIA Document G701TM - 2001 <br />Change Order <br />PROJECT (Name and address): <br />Eugene School District 4J, MS Synthetic <br />Turf Field 2008 - Spencer Butte Middle <br />School <br />TO CONTRACTOR (Name and address). <br />Eugene Sand Construction, Inc. <br />PO Box 1067 <br />Eugene, OR 97440 <br />CHANGE ORDER NUMBER: 002 <br />DATE: August 26, 2008 <br />ARCHITECT'S PROJECT NUMBER: 0718.00 <br />CONTRACT DATE: April 22, 2008 <br />CONTRACT FOR: General Construction <br />UVVNtK: IN <br />ARCHITECT: <br />CONTRACTOR:® <br />FIELD: ❑ <br />OTHER: ❑ <br />THE CONTRACT IS CHANGED AS FOLLOWS: <br />(Include, where applicable, any undisputed amount attributable to previously executed Construction Change Directives) <br />See attached Change Order Summary dated August 26,2008 <br />The original Contract Sum was $ 930,990.60 <br />The net change by previously authorized Change Orders $ 76,385.00 <br />The Contract Sum prior to this Change Order was $ 1,007,375.00 <br />The Contract Sum will be increased by this Change Order in the amount of $ 79,118.00 <br />The new Contract Sum including this Change Order will be $ 1,086,493.00 <br />The Contract Time will be increased by Twelve ( 5 ) days. <br />The date of Substantial Completion as of the date of this Change Order therefore is September 11, 2008 <br />NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which <br />have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and <br />Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. <br />NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. <br />J <br />PIVOT Architecture Eugene Sand Construction, Inc. <br />ARCHITECT (Firnt nar3le) CONTRACTOR (Firm name) <br />72 West Broadway, ite 2 0, Eugene, <br />OR 97401 <br />ADDRESS <br />BY (Signature)' U <br />Bill Seider, AIA (Typed name) <br />0 <br />DATE <br />PO Box 1067, Eugene, OR 97440 <br />ADDRESS l r=~~.~~ \ <br />BY ( ignature) <br />(Typed name) <br />~Iz7 <br />DATE ' III <br />Eugene School District 4J <br />OWNER (Finn name) <br />715 W. 4TH Avenue, Eugene, OR,9-7402 <br />BYl(Signature) 4-11 if <br />/.0 17o'l <br />(Typed name) <br />7 <br />DATE <br />AIA Document G701TM -2001. Copyright © 1979, 1987, 2000 and 2001 by The American Institute of Architects. All rights reservea. VYAMNI vu: 1'7 <br />Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA Document, or any <br />portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document <br />was produced by AIA software at 08:16:34 on 08/27/2008 under Order No. 10003260421 which expires on 10/14/2008, and is not for resale. (1248098078) <br />User Notes: <br />
The URL can be used to link to this page
Your browser does not support the video tag.