New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4625 OBEC 2010-00223
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2009
>
GJN4625 OBEC 2010-00223
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 12:28:50 PM
Creation date
12/9/2009 11:04:38 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004625
GL_Project_Number
995884
COE_Contract_Number
2010-00223
Retention_Destruction_Date
6/1/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Engineering Services for Eugene Airport Runway Overlay Vault Covers <br />City of Eugene <br />OBEC Consulting Engineers <br />T <br />SR PROJ SR PROJ SR CAD <br />MGR ENGR TECH <br />NOV, 2009 <br />SR ENGR ADMIN SUBTASK TOTAL <br />TECH 3 TOTAL HOURS <br />Task 1 - Management & Data Collection <br />1.1 Overall Project Management o Al 12 <br />Task 2 - Pre-Design Cost Estimate <br />2.1 <br />Pre-Design Structural Calculations <br />6 <br />6 <br />2.2 <br />Pre-Design Quantities and Engineer's Estimate 1 <br />3 <br />1 5 <br />Task 3 - 60% Design <br />3.1 60% Design Calculations 12 12 <br />3.2 60% Drafting (3 Sheets Estimated) 1 28 29 <br />3.3 60% Specifications 6 2 8 <br />3.4 60% Quantities and Engineer's Estimate 1 3 4 <br />Task 4 - Final Design ] I 1 1 <br />4.1 Final Design Calculations 12 12 <br />4.2 Final Drafting (3 Sheets Estimated) 1 14 15 <br />4.3 Final Specifications 6 2 8 <br />4.4 Final Quantities and Engineer's Estimate 3 3 <br />Task 5 - Construction Engineering and QC <br />5.1 Shop Drawing Review 12 12 <br />5.2 Off-Site Observation Visits (4 Estimated @ 5 Hours Ea) 20 20 <br />5.3 On-Site Observation Visits (4 Estimated at 5 Hours Ea) 20 20 <br />5.4 Observation Memos 8 8 <br />Task 6 - As-Constructed Plans and Letter of Compliance I <br />6.1 As-Constructed Plans 2 4 6 <br />6.2 Letter of Compliance 1 2 1 4 <br />_ TOTAL HOURS 13 67 46 48 10 184 184 <br />_ HOURLY RATES $134.00 $118.00 $79.00 $98.00 $65.00 <br />TOTAL LABOR ESTIMATE $1,742 $7,906 $3,634 $4,704 $650 $18,636 <br />LABOR ESTIMATE $18,636 <br />_ ESTIMATED EXPENSE $734 <br />TOTAL ESTIMATE $19,370 <br />Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.