Engineering Services for Eugene Airport Runway Overlay Vault Covers <br />City of Eugene <br />OBEC Consulting Engineers <br />T <br />SR PROJ SR PROJ SR CAD <br />MGR ENGR TECH <br />NOV, 2009 <br />SR ENGR ADMIN SUBTASK TOTAL <br />TECH 3 TOTAL HOURS <br />Task 1 - Management & Data Collection <br />1.1 Overall Project Management o Al 12 <br />Task 2 - Pre-Design Cost Estimate <br />2.1 <br />Pre-Design Structural Calculations <br />6 <br />6 <br />2.2 <br />Pre-Design Quantities and Engineer's Estimate 1 <br />3 <br />1 5 <br />Task 3 - 60% Design <br />3.1 60% Design Calculations 12 12 <br />3.2 60% Drafting (3 Sheets Estimated) 1 28 29 <br />3.3 60% Specifications 6 2 8 <br />3.4 60% Quantities and Engineer's Estimate 1 3 4 <br />Task 4 - Final Design ] I 1 1 <br />4.1 Final Design Calculations 12 12 <br />4.2 Final Drafting (3 Sheets Estimated) 1 14 15 <br />4.3 Final Specifications 6 2 8 <br />4.4 Final Quantities and Engineer's Estimate 3 3 <br />Task 5 - Construction Engineering and QC <br />5.1 Shop Drawing Review 12 12 <br />5.2 Off-Site Observation Visits (4 Estimated @ 5 Hours Ea) 20 20 <br />5.3 On-Site Observation Visits (4 Estimated at 5 Hours Ea) 20 20 <br />5.4 Observation Memos 8 8 <br />Task 6 - As-Constructed Plans and Letter of Compliance I <br />6.1 As-Constructed Plans 2 4 6 <br />6.2 Letter of Compliance 1 2 1 4 <br />_ TOTAL HOURS 13 67 46 48 10 184 184 <br />_ HOURLY RATES $134.00 $118.00 $79.00 $98.00 $65.00 <br />TOTAL LABOR ESTIMATE $1,742 $7,906 $3,634 $4,704 $650 $18,636 <br />LABOR ESTIMATE $18,636 <br />_ ESTIMATED EXPENSE $734 <br />TOTAL ESTIMATE $19,370 <br />Page 1 <br />