New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4608 Eugene Sand CO#1
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2009
>
GJN4608 Eugene Sand CO#1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 12:12:02 PM
Creation date
12/1/2009 11:57:20 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004608
COE_Contract_Number
2010-00007
Retention_Destruction_Date
6/24/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF EUGENE DEPARTMENT OF PUBLIC WORKS <br />ENGINEERING DIVISION <br />Change Order Job # 4sos <br />Contract # 2010-007 CONTRACTOR: Eu ene Sand Construction Inc. Change Order # 1 <br />(ADDRESS) PO Box 1067 Date: 11110109 Eugene OR 97440 CAMS Date: <br />Reviewed by: Date: <br />PROJECT: Echo Hollow Tennis Court Overla Pro'ect Ins ector: Keith Jurasevich at 1655 Echo Hollow Road Const. Lead Kns Olson <br />Pro'. M r. David Stams Civil En . Teri Hf ins t <br />Principal End. Michelle Cahill You are directed to make the following changes in this contract: <br />Contract <br />Item No. <br />This chan a order will extend the on inai contract com letion date from November 2, 2009 to Jul 45 2040 due to weather conditions <br />that will not allow the work to take lace. The contractor a tees to hold the As halt Surfacin rice as bid with no increase. <br />100 The Surface cleanin item is re aired to resume this s tin . The contractor will ressure wash and clean the existin surface, and com fete rode <br />corrections to tolerances re aired b the s eci0cations and manufacturer's re uirements before a lication of the athletic surfacin can take lace. <br />This changes the bid items as follows: <br />Contract Contract Item Time Quantity Unit Amended Net <br />No. Item Change (Units} Cost Amount ~fl~} Change Change Ori inai 0,00 0.00 0.00 $0.00 <br />Revised 0.00 0.00 0,00 100 Surface Cleaning Amended 1.00 LS $800A0 $800.00 $800A0 <br />Ori inai 0.00 0,00 0.00 $0.00 <br />Revised 0.00 0,00 0.00 Amended 0.00 $0.00 $0,00 $OAO <br />Ori inai 0.00 0,00 0.00 $OAO Revised 0.00 0.00 0.00 <br />Amended 0,00 $0.00 $0.00 $OAO <br />Ori inai 0.00 0,00 0.00 $OAO Revised 0.00 0.00 0.00 <br />Amended 0.00 $0,00 $0.00 $0.00 Ori inai 0.00 0.00 0.00 $0,00 <br />Revised 0.00 0,00 0.00 <br />Amended 0,00 $0.00 $0.00 $0,00 Ori inai 0.00 0,00 0.00 $0.00 <br />Revised 0.00 0,00 0.00 Amended 0.00 $0.00 $0.00 $O.oO <br />The original contract work days are o.o da s <br />The contract time change this C.4 0.o da s <br />The contract time change by previous CA.'s 0.0 da s The new contract work da s are o.o days <br />The original contract sum was X92,990.00 <br />Net change by previous change arder ~o.oo <br />Net change due to amendmen# by previous change order X0.00 The contract sum prior to this change artier was $92,990.00 <br />This change order will change contract sum by this amount $800.00 The new contract net change sum ~o.oo <br />The new contract amendment sum $800.00 <br />The new contract sum including this change order will..~~ $93,790.00 Percenta a of ari inai contract 0.8610 <br />NET CHANGE: DUE TO AMENDMENTS 0.86/0 <br />Approval by: <br />City Engin er ~ Prime Contractor Third Party <br />~ <br />Date Date Date <br />CONTRACTOR ~ OFFICE FILE ~ PURCNASINGICRO <br />Q:IPROJECTSIPROJ-8146081CanstructionlChange Orders14608-20091110 Change Order1.xls <br />- <br />
The URL can be used to link to this page
Your browser does not support the video tag.