CITY OF EUGENE DEPARTMENT OF PUGLIC WORKS <br />ENGINEERING DIVISION <br />Change Omer Jab# ~soe Contract# 201aoa7 Ct7NTRACTQR: Eugene Ss~id Cans~uc4on Inc. Change t)rder# 1 <br />iAOtNiESS) P49ox1o67 Date: 1111 !wagons OR 97440 CAMS Cate; <br />Reviewed by: Data: PROJECT: Echo Hallow Tennis Court Cverlay Protect _ _ _ _ inspector. Keith Jurasevich <br />at 1655 Echo Hnllaw Road Const. Lead Kris Oisan Pro . tN r. David Stems ClvEl En . Ted FO ins i <br />Prindpal Eng. Michelle Cah11i - Youare directed to make the following d~anges In this contract. <br />Contract Item <br />No. <br />This than a orderwig extend the ari final contract cam letion date from ,November 2049 to Jut i5 2090 due to weather canditlons chat will not allow she work to take ce. The contractor <br />a Tees to hold the As halt Swfacln ce as bid with no f rraaase. <br />10a The Surface meanie Item is aired to resume this ri , The corrtrantarwill ressura wash and clean the exis4n surface and cam fete rode <br />carredions to lalerances re aired b the s edttcatlons and manufacturer's re uirements before a licatiorr of the athle0c surfacin an take lace. <br />This changes the bid Items as follows: <br />Contract Contract Item Time Quantity Unit Amended Net No. l6em Change (Units) Cost Amount [+1--) Change Change <br />od Inai O.OD D.Oa AD $p.40 ltevlsed o.oo o.Da DD <br />30a Sutt'ar~ geaning Amended 1.00 is o0.00 80D,oa $804.00 Ori inai 0.00 0.40 D.DO $OA4 <br />Raised oAa .DO .D4 Amended a.04 $0.00 0.00 $0.00 Od Inal 0.610 0.04 0.00 $D.00 <br />Revised 0.00 0.00 D.OD Amended OAO $0.00 $0.04 $OAO <br />Ori final OAO .OD 4.OD $0.00 Revised OAa .OD .00 <br />Amended 4A4 0.00 O.Oa 4.00 Ori Inal 0.00 .a0 .00 $0.40 Revised D.ao .aa .oo <br />Amended OAO $0,04 $0.00 $0.00 on Inal a.oo 4Aa .oD $0.04 <br />itevl5ed a.DO DAa a.Da Amended 0.011 $OAO a.00 .Dd <br />The original contract work days are D.4 da The contract time change this C.0 0.o da <br />The contract time change by previous CA: s o.o da The new contract work da s are o.o days <br />The original contract sum was ;1.92,990.00 <br />Net change by previous change order ~o•~ Net change due to amendment by previous ctsange order $0.00 <br />The contract sum prior to this change orderwas $gz,seo.oa This dtange ordervuill change contract sum by this amount tso4a.4o The new contract net change sum _ ~O.o4 <br />The new contract amendment sum Sttao.a0 The new contaac# sum including the change order wiu be 593,~sa.DD <br />Percenta a of oti final contract o.oss~ . HET CHAN~G~E DlJE TO AMENpF4ENTS 1~ Q'~~ <br />App~,~o <br />~`~f ,r~l City Ineer ~ Prime Contrackar Third Party <br />/ a r{ ~ ~ Q <br />Da e r D Date . <br />CONTRACTOR D OFFICE FILE L1 PURCWAStNG1CRQ <br />QsIPRQJECTSIPRCJ~148081ConstnrctlanlGhange tkders14046.20091910 Change Onderl.xlss <br />