New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4657 4664
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2009
>
GJN4657 4664
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 12:41:58 PM
Creation date
11/30/2009 3:25:01 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004657
GL_Project_Number
905074
COE_Contract_Number
2010-00221
Retention_Destruction_Date
8/3/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Eugene Contract #2010-00221 <br />Exhibit C - ARRA funding reporting language <br />AMERICAN RECOVERY & REINVESTMENT ACT (ARRA) REQUIREMENTS <br />Consultant's Reportine Obligations under 2009 ARRA Federal Stimulus Funding <br />[Note: The Monthly Employment Report form and Reporting Instructions are incorporated from <br />the Internet at the hyperlinks provided below in these ARRA related provisions. Agency may <br />revise the form and/or reporting instructions if revisions are determined necessary by the federal <br />funding agency or other federal agency responsible for production of the form and instructions; <br />and they shall become part of the WOC when revised and posted by Agency without an <br />amendment to the WOC. Consultant shall report using the most current form and reporting <br />instructions provided by Agency.] <br />This project includes American Recovery & Reinvestment Act (ARRA) funding. States must <br />collect and analyze certain employment data for each ARRA funded contract. <br />The prime Consultant shall complete a separate Monthly Employment Report for each ARRA <br />project once, each month from the date of the Notice to Proceed until completion of the WOC. <br />Consultant shall provide, aggregated on one form per project, the required information for their <br />own workforce as well as the workforce of all subcontractors (including all sub-tiers) that were <br />active on their ARRA funded project(s) for the reporting month. <br />Consultant's timely, complete, accurate, and truthful compliance with the reporting obligations <br />constitutes a material component of the Consultant's performance of this WOC. Agency may <br />withhold any amounts otherwise due to the Consultant under this WOC until the Consultant has <br />submitted any report that is late. <br />Due date: Reports are due within 10 calendar days after the end of every month until project <br />completion or until September 2012, which ever is sooner. <br />Due to: Reports must be emailed to ARRArgporting&odot.state.or.us with a copy to the <br />Project Manager, Project Leader, or Local Agency Liaison. (Agency may require <br />report submittal via website interface if a web-based interface is established.) <br />Monthly Employment Report Form and Instructions <br />The monthly ARRA Employment report for each project must include all required information <br />as stated on the Reporting Instructions. The monthly ARRA Employment Report form and <br />Reporting Instructions, which may be revised from time to time, are available for download from <br />the Internet (at the hyperlinks provided below) and are incorporated into this WOC with the <br />same force and effect as if fully set forth herein. For each monthly report, it is the Consultant's <br />responsibility to confirm they are using the then most current form and instructions by reviewing <br />them at the following hyperinks: <br />
The URL can be used to link to this page
Your browser does not support the video tag.