r~ <br />v~G.Y E~, i <br />5th and St. Storm V <br />Mobilization $8,000.00 <br />Traffic Control $8,000.00 <br />Erosion Control $2,000.00 <br />12" Pipe $120.00 150 If <br />SD Manhole $2,500.00 2 ea <br />Inlet $1,800.00 2 ea <br />Site total construction cost <br />15th Agate to Moss <br />Mobilization $10,000.00. 1 Is <br />Traffic Control $3,OQ0.00 1 Is <br />Erosion Control $1,200.00 1 Is <br />15" sd pipe $90.00 850. If <br />10" Pipe $120.00 150 if <br />SD Manhole $2,500.00 4 ea <br />4A Inlet $1,800.00 6 ea <br />Site total construction cost <br />All Sits total construction cost <br />Project Total <br />$8,000.00 <br />$3,000.00 <br />$1,200.00 <br />$0.00 <br />$18,000.00 <br />$5,000.00 <br />$3,600.00 <br />$38,800.00 <br />$10,000.00 <br />$3,000.00 <br />$1,200.00 <br />$76,500.00 <br />$18,000.00 <br />$10,000.00 <br />$10,800.00 <br />$129,500.00 <br />$257,450.00 <br />$362,187.50 <br />