New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4671 PBS 11.23.09
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2009
>
GJN4671 PBS 11.23.09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 12:49:43 PM
Creation date
11/23/2009 8:43:40 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Project Authorization
PW_Active
No
External_View
No
GJN
004671
GL_Project_Number
905186
Retention_Destruction_Date
1/31/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Storm Rehabilitation 2010 / # <br />Item <br />Direct cost <br />Cost quant. <br />Unit <br />Engineering <br />25.00% <br />Permitting <br />5.00% <br />Staff Support <br />0.00% <br />$5,000.00 <br />Bid / Does I Warnty <br />0.00% <br />$3,000.00, <br />Coburg Rd near Oakway Mall <br />Mobilization <br />$8,000.00 <br />Traffic Control <br />$8,000.00 <br />Erosion Control <br />$2,000.00 <br />12" Pipe <br />$250.00 <br />25 <br />If <br />Catchbasin <br />$550.00 <br />1 <br />ea <br />Connection <br />$3,000.00 <br />1 <br />ea <br />Site tota <br />l construction cost <br />11th at Chambers <br />Mobilization <br />$8,000.00 <br />Traffic Control <br />$8,000.00 <br />Erosion Control <br />$2,000:00 <br />12" Pipe <br />$250.00 <br />15 <br />If <br />Catchbasin <br />$550.00 <br />1 <br />pa <br />Connection <br />$3,000.00 <br />1 <br />ea <br />Site total construction cost <br />17th and Villard <br />Mobilization <br />$8,000.00 <br />Traffic Control <br />$8,000.00 <br />Erosion Control <br />$2,000.00 <br />10" Pipe <br />$100.00 <br />100 If <br />SD Manhole <br />$2,500.00 <br />2 ea <br />Catchbasin <br />$1,500.00 <br />5 ea <br />ADA Retrofit <br />$450.00 <br />3 ea <br />Site total construction cost <br />Sub total <br />$64,362.50 <br />$32,375.00 <br />$5,000.00 <br />$3,000.00 <br />$8,000.00 <br />$8,000.00 <br />$2,000.00 <br />$0.00 <br />$6,250.00 <br />$550.00 <br />$3,000.00 <br />$27,800.00 <br />$8,000.00 <br />$8,000.00 <br />$2,000.00 <br />$0.00 <br />$3,750.00 <br />$550.00 <br />$3,000.00 <br />$25,300.00 <br />$8,000.00 <br />$3,000.00 <br />$1,200.00 <br />$0.00 <br />$10,000.00 <br />$5,000.00 <br />$7,500.00 <br />$1,350.00 <br />$36,050.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.