Storm Rehabilitation 2010 / # <br />Item <br />Direct cost <br />Cost quant. <br />Unit <br />Engineering <br />25.00% <br />Permitting <br />5.00% <br />Staff Support <br />0.00% <br />$5,000.00 <br />Bid / Does I Warnty <br />0.00% <br />$3,000.00, <br />Coburg Rd near Oakway Mall <br />Mobilization <br />$8,000.00 <br />Traffic Control <br />$8,000.00 <br />Erosion Control <br />$2,000.00 <br />12" Pipe <br />$250.00 <br />25 <br />If <br />Catchbasin <br />$550.00 <br />1 <br />ea <br />Connection <br />$3,000.00 <br />1 <br />ea <br />Site tota <br />l construction cost <br />11th at Chambers <br />Mobilization <br />$8,000.00 <br />Traffic Control <br />$8,000.00 <br />Erosion Control <br />$2,000:00 <br />12" Pipe <br />$250.00 <br />15 <br />If <br />Catchbasin <br />$550.00 <br />1 <br />pa <br />Connection <br />$3,000.00 <br />1 <br />ea <br />Site total construction cost <br />17th and Villard <br />Mobilization <br />$8,000.00 <br />Traffic Control <br />$8,000.00 <br />Erosion Control <br />$2,000.00 <br />10" Pipe <br />$100.00 <br />100 If <br />SD Manhole <br />$2,500.00 <br />2 ea <br />Catchbasin <br />$1,500.00 <br />5 ea <br />ADA Retrofit <br />$450.00 <br />3 ea <br />Site total construction cost <br />Sub total <br />$64,362.50 <br />$32,375.00 <br />$5,000.00 <br />$3,000.00 <br />$8,000.00 <br />$8,000.00 <br />$2,000.00 <br />$0.00 <br />$6,250.00 <br />$550.00 <br />$3,000.00 <br />$27,800.00 <br />$8,000.00 <br />$8,000.00 <br />$2,000.00 <br />$0.00 <br />$3,750.00 <br />$550.00 <br />$3,000.00 <br />$25,300.00 <br />$8,000.00 <br />$3,000.00 <br />$1,200.00 <br />$0.00 <br />$10,000.00 <br />$5,000.00 <br />$7,500.00 <br />$1,350.00 <br />$36,050.00 <br />