00744.90 Payment tl <br />(REPLACE) The first paragraph with the following: <br />The accepted quantities of HMAC incorporated into this project, will be paid at <br />the contract price per Speed Bump (EACH). <br />00850.02 Type B preformed, fused thermoplastic film shall be used to construct the legend <br />markings on the speed bumps. <br />00940.80 Measurement <br />(REPLACE) This section with: <br />The accepted quantity of signs will be measured per each in place, and shall <br />include. all materials and labor necessary for the installation. <br />00940.90 Payment <br />(REPLACE) This section with: <br />The accepted quantities of signs incorporated into this project, will be paid at the <br />contract price per sign installed (EACH). <br />Special Provisions - Job #4658 <br />Page 3 <br />