(ADD) 00180.85(b) Liquidated Damages Add the following paragraph: <br />The liquidated damages for failure to complete the Work on time is $100.00 per <br />Calendar Day. <br />00220.40(e) Lane Restrictions - Do not close any traffic lanes on Praslin Street Monday <br />through Friday, between: <br />7:00 a.m. - 8:00 a.m. <br />and <br />5:00 p.m. - 6:00 p.m. <br />(ADD) 00220.40(f) Road' Ciosure -With appropriate signing_or flagging, the road may, <br />be closed to through traffic, local traffic shall be maintained at all times. Do not <br />close the road until all materials and equipment are on hand or guaranteed to be <br />delivered so that the work can be done in an efficient manner with a minimum <br />period of road closure. <br />No road closure will be permitted until the area is signed according to the TCP <br />and the requirements of Section 00225. <br />00225.02 General Requirements <br />(ADD) At a minimum the TCP will include the following: <br />1. Access for local traffic at all times. Coordination with the owner/occupant for <br />any driveway closures. If detours are used, the Contractor shall provide <br />signing approved by the Engineer. <br />2. Two-way traffic (one lane in each direction) will be provided at the end of <br />each work day, on weekends and holidays, and other non-work times except <br />as directed by the Engineer. <br />00225.90a Method "B" Lump Sum Basis <br />Method "B" lump sum will be the method of payment for Work. Zone Traffic <br />Control. <br />(ADD) Flagging is included under this Bid Item. <br />00744.00 Hot Mixed Asphalt Concrete Pavement This specification shall apply to this <br />Project. <br />00744.80 Measurement <br />(DELETE) The first sentence <br />(ADD) The accepted quantities of HMAC will be measured per speed hump (EACH) <br />Special Provisions - Job #4658 Page 2 <br />