IV/V0/LVVZJ 14.'00 rAA 041 bbG b41V idly tubthlt FW tNb <br />lID002/004 <br />Ash <br />Public Works <br />Engineering <br />City of Eugene <br />99 East Broadway, Suits 400 <br />Eugene, Oregon 97401 <br />ADDENDUM No. 2 (541) 682.5560 <br />(541) 682-8410 FAX <br />TO TIM CONTRACT DOCUMENTS AND SPECIFICATIONS FOR <br />LIFEFLIGHT HELVAD AT FIRE STATION 2 <br />OCTOBER 5, 2009 JOB 94656 BID NUMBER, 26 <br />TO ALL PLANHOLDERS: <br />The following changes shall amend and supplement the project bidding documents only to the extent specifically <br />shown and noted. All other conditions shall remain the same. <br />Bidders shall incorporate the effects of these changes in the appropriate bid items included in this addendum and <br />the total of these bid items then add in the appropriate place on the bid form. <br />CHANGES TO CALL FOR BIDS & PROPOSAL: <br />(DELETE) Bid Closing: Tuesday, October 6, 2009, 2:00 PM <br />(ADD) Bid Closing: Thursday, October 8,2009,3;00 PM <br />CHANGES TO BID SCHEDULE: <br />(DELETE) Revised Bid Schedule dated 10/01/2009 <br />(ADD) Revised $id Schedule dated 10/05/2009 <br />If you have questions about this addendum or the project please contact Teri Higgins at (541) 682-8462. <br />All bidders shall acknowledge the receipt of and acceptance of this Addendum No. 2 by signing and submitting the <br />signed Addendum with the bid. Bids submitted without this Addendum, or with the Addendum not signed, will be <br />Woconside infor mal. <br />ening, P.E. <br />City Engineer <br />Receipt acknowledged and conditions agreed <br />this 5tl ay of October, 2009. <br />Bidder: John Hyland Const. <br />By: <br />Addendum #2 - Job #4656 Page 1 <br />