10/01/2009 16:04 FAX 341 662 5366 CITY EUGENE Pw ENG IM 002/005 <br />Public Works <br />Engineering <br />ADDENDUM NO.1 <br />City of Eugene <br />99 East Broadway, Suite 400 <br />Eugene, Oregon 97401 <br />(541)682.5560 <br />(541) 682-8410 FAX <br />TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS FOR <br />LIFIEFLIGHT HELIPAD AT FIRE STATION 2 <br />OCTOBER 1, 2009 JOB #4656 BID NUMBER 26 <br />TO ALL PLANHOLDERS: <br />The following changes shall amend and supplement the project bidding documents only to the extent specifically <br />shown and noted. All other conditions shall remain the same. <br />Bidders shall incorporate the effects of these changes in the appropriate bid items included in this addendum and <br />the total of these bid items then add in the appropriate place on the bid form. <br />CHANGES TO BID SCHEDULE: <br />(DELETE) Bid Schedule dated 09/23/2009 <br />(ADD) Revised Bid Schedule dated 10/01/2009 <br />CHANGES TO DRAWINGS: <br />(ADD) Drawing Sbeet ADDENDUM NO.'1 <br />If you have questions about this addendum or the project please contact Teri Higgins at (541) 682-8462. <br />All bidders shall acknowledge the receipt of and acceptance of this Addendum No. 1 by signing and submitting the <br />sighed Addendum with the bid. Bids submitted without this Addendum, or with the Addendum not signed, will be <br />consi red informal. <br />/50 M choening, P. . <br />City Engineer <br />Receipt acknowledged and conditions <br />this 1st day of October '2009. <br />Bidder: John Hyland Cons t . , Inc <br />By: <br />Addendum #1-,lob #4656 Page 1 <br />