Run Date: 11/04/2009 11:05:40 Page 4 <br /> City of Eugene <br /> Contract Preliminary Progress Payment <br /> Payment No 003 <br /> Contractor: WILDISH CONSTRUCTION Original Contract: $878,656.55 <br /> Job 93-004528 Current Amount: $878,656.55 <br /> Contract No: 2009-00026 Contract Award Date: 06/15/2009 <br /> PO 2009100420 Completion Date: 10/02/2009 <br /> Assessable: No <br /> Current Contract Estimated Payment Cumulative Totals ~ Complete <br /> Line Description Last Chng Ord Unit Price Unit Measure Quantity Amount Quantity Amount Quantity Amount <br /> 0420 REPLACE CURB INLET TOP $1,000.00 EACH 1.000 $1,000.00 1.000 $1,000.00 1.000 $1,000.00 100.00 <br /> 0430 ASPHALT CONCRETE PAVEMENT REPA $85.00 CUYD 210.000 $17,850.00 0.000 <br /> $0.00 114.110 $9,699.35 54.00 <br /> 0440 COLD PLANE PVMT REMOVAL, TAPER $0.42 SQFT 3,840.000 $1,612.80 0.000 $0.00 0.000 $0.00 0.00 <br /> 0450 COLD PLANE PVMT REMOVAL, 1" DE $0.06 SQFT 36,700.000 $2,202.00 0.000 $0.00 37,196.700 $2,231.80 101.00 <br /> 0460 COLD PLANE PVMT REMOVAL, 3" DE $0.15 SQFT 51,730.000 $7,759.50 0.000 $0.00 57,525.400 $8,628.81 111.00 <br /> 0470 COLD PLANE PVMT REMOVAL, TAPER $0.15 SQFT 47,210.000 $7,081.50 0.000 $0.00 50,999.700 $7,649.96 108.00 <br /> 0480 COLD PLANE PVMT REMOVAL, 6" DE $0.38 SQFT 12,700.000 ,$4,826.00 0.000 $0.00 ,12,901.000 $4,902.38 102.00 <br /> 0490 LEVEL 3, 1/2" DENSE WMAC $49.00 TON 3,200.000 $156,800.00 95.180 $4,663.82 -2,994.320 $146,721.68 M 94.00 <br /> 0500 THIN WHITETOPPING $3.80 SQFT 12,330.000 $46,854.00 0.000 $0.00 .12,334.000 $46,869.20 100.00 <br /> 0510 SAW CUTTING FOR THIN WHITETOPP $2.00 FT 4,350.000 $8,700.00 0.000 $0.00 4,224.000 $8,448.00 97.00 <br /> 0520 CONCRSTS WIDE CURB AND GUTTER $65.00 FT 65.000 $4,225.00 0.000 $0.00 ,100.500 $6,532.50 155.00 <br /> 0530 PVMT LEGEND, TYPE A2: ARROWS $160.00 EACH 10.000 $1,600.00 0.000 $0.00 '10.000 $1,600.00 100.00 <br /> 0540 PVMT LEGEND, TYPE A2: BICYCLE $165.00 EACH 6.000 $990.00 0.000 $0.00 6.000 $990.00 100.00 <br /> 0550 PVMT LEGEND, TYPE A2: RR CROSS $900.00 EACH 6.000 $5,400.00 0.000 $0.00 6.000 $5,400.00 100.00 <br /> 0560 PVMT LEGEND, TYPE A2: BIKE RR $550.00 EACH 6.000 $3,300.00 0.000 $0.00 6.000 $3,300.00 100.00 <br /> 0570 PVMT LEGEND, TYPE A2: "STOP" $200.00 EACH 4.000 $800.00 0.000 $0.00 4.000 $800.00 100.00 <br /> 0580 PVMT LINE, TYPE A2 OR B $6.00 SQFT 725.000 $4,350.00 0.000 $0.00 727.800 $4,366.80 100.00 <br /> 0590 MONO-DIRECTIONAL CRYSTAL TYPE $4.00 EACH 725.000 $2,900.00 0.000 $0.00 38.000 $152.00 5.00 <br /> 0600 BI-DIRECTIONAL YELLOW TYPE I M $4.00 EACH 225.000 $900 00 0 000 $0 00 213 000 $852 00 95 00 <br /> 0610 THERMOPLASTIC, NON-PROFILE, 90 $19,700.00 LUMPSUM 1.000 $19,700.00 0.000 $0.00 ~ 1.000 $19,700.00 100.00 <br /> 0620 LOOP DETECTORS INSTALLATION $453.00 EACH 18.000 $8,154.00 18.000 $8,154.00 18.000 $8,154.00 100.00 <br /> 0630 JUNCTION BOX, TYPE 1 $356.00 EACH 3.000 $1 068 00 0 000 $0 00 3 000 $1,068 00 lOD 00 <br /> 0640 CONDUIT UNDER LANDSCAPED AREAS $15.45 FT 115.000 $1,776.75 0.000 $0.00 110.500 $1,707.23 96.00 <br /> <br /> 0650 CONDUIT UNDER HARD SURFACING $52.50 FT 70.000 $3,675.00 0.000 $0.00 ' 98.000 $5,145.00 140.00 <br /> <br />