Run Date:'ll/04/2009 10:40:02
<br /> Page 2
<br /> City of Eugene
<br /> Contract Preliminary Progress Payment
<br /> Payment No 006
<br /> Contractor: KNIFE RIVER Original Contract: $2,034,034.43
<br /> Job 93-004275 Current Amount: $2,034,034.43
<br /> Contract No: 2009-00018 Contract Award Date: 05/01/2009
<br /> PO 2009100358 Completion Date: 10/01/2009
<br /> Assessable: Yes
<br /> Current Contract Estimated Payment Cumulative Totals ~ Complete
<br /> Line Description Last Chng Ord Unit Price Unit Measure Quantity Amount Quantity Amount Qum Amount
<br /> ELMIRA-BWY 99 TO BERTELSEN, PAV, C/W, ILLUM & STM
<br /> General
<br /> 0000 Liquidated Damages ($1,000.00) DAY 0.000 $0.00 0.000 $0.00 0.000 $0.00 0.00
<br /> 0010 MOBILIZATION $45,493.18 LUMPSUM 1.000 $45;493.18 0.000 $0.00 1.000 $45,493.18 100.00
<br /> 0020 TEMP. WORK ZONE TRAFFIC CONTRO $7,500.00 LUMPSUM 1.000 $7,500.00 0.000 $0.00 0.950 $7,125.00 95.00
<br /> 0030 EROSION CONTROL $3,000.00 LUMPSUM 1.000 $3,000.00 0.000 $0.00 0.950 $2,850.00 95.00
<br /> 0040 CLEARING AND GRUBBING $15,000.00 LUMPSUM 1.000 $15,000.00 0.000 $0.00 1.000 $15,000.00 100.00
<br /> 0050 TREE PROTECTION $2,500.00 LUMPSUM 1.000 $2,500.00 0.000 $0.00 1.000 $2,500.00 100.00
<br /> 0060 FLAGGERS $46.00 HOUR 2,700.000 $124,200.00 334.000 $15,364.00 1,911.000 $87,906.00 71.00
<br /> 0070 TREE REMOVAL, 5" TO 24" $600.00 EACH 10.000 $6,000.00 0.000 $0.00 7.000 $4,200.00 70.00
<br /> 0080 TREE REMOVAL, 25" TO 36" $700.00 EACH 13.000 $9,100.00 0.000 $0.00 14.000 $9,800.00 108.00
<br /> 0090 TREE REMOVAL, OVER 37" $800.00 EACH 7.000 $5,600.00 0.000 $0.00 7.000 $5,600.00 100.00
<br /> 0100 TREE REMOVAL DURING EXCAVATION $800.00 EACH 10.000 $8,000.00 0.000 $0.00 0.000 $0.00 0.00
<br /> 0110 REMOVAL OF STRUCTURES AND OBST $27,560.00 LUMPSUM 1.000 $27,560.00 0.000 $0.00 1.000 $27,560.00 100.00
<br /> 0120 GENERAL EXCAVATION $9.00 CUYD 18,894.000 $170,046.00 894.000 $8,046.00 18,894.000 $170,046.00 100.00
<br /> 0130 ROOT ZONE EXCAVATION $40.00 FOOT 250.000 $10,000.00 0.000 $0.00 0.000 $0,00 0.00
<br /> 0140 6" SUBGRADE~STABILIZATION EXCA $9.50 CUYD 3,304.000 $31,388.00 0.000 $0.00 2,773.000 $26,343.50 84.00
<br /> 0150 6" SUBGRADE STABILIZATION AGGR $3.00 SQYD 19,823.000 $59,469.00 0.000 $0.00 14,536.000 $43,608.00 73.00
<br /> 0160 AGGREGATE BASE, 6 IN. THICK $4.00 SQYD 19,823.000 $79,292.00 0.000 $0.00 19,823.000 $79,292.00 100.00
<br /> 0170 RE-USE EXISTING AGGREGATE BASE $1.00 CUYD 4,000.000 $4,000.00 0.000 $0.00 448.500 $448.50 11.00
<br /> 0180 SUHGRADE GEOTEXTILE $1.00 SQYD 19,823.000 $19,823.00 0.000 $0.00 16,143.500 $16,143.50 81.00
<br /> 0190 6 INCH WW PIPE, C90D $27.00 FOOT 500.000 $13,500.00 0.000 $0.00 0.000 $0.00 0.00
<br /> 0200 6 INCH WW PIPE, PVC $27.00 FOOT 500.000 $13,500.00 0.000 $0.00 449.800 $12,144.60 90.00
<br />
<br /> 0210 4 INCH ROOF DRAIN PIPE $25.00 FOOT 350.000 $8,750.00 117.500 $2,937.50 117.500- $2,937.50 34.00
<br />
<br />
|