New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
LCOG 2010-00217 Unified Planning Work Program FY10
COE
>
PW
>
Admin
>
Finance
>
Operating
>
2009
>
LCOG 2010-00217 Unified Planning Work Program FY10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2011 2:26:40 PM
Creation date
10/19/2009 2:50:48 PM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Contracts
Fiscal_Year
2010
PW_Division
Engineering
GL_Fund
131
GL_ORG
9340
GL_Grant
346
Identification_Number
2010-00217
COE_Contract_Number
2010-00217
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 57 of 93 <br /> <br /> Transportation System Modeling and <br /> Data-Maintenance <br /> ESTIMATED TIMELINE <br /> Early Late Early Late FY <br /> Action Item Number/Title FY 2010 FY 2010 FY 201 1 201 I <br /> Model selection Model testing .Display and <br /> Land Use Allocation Final <br /> and data needs and validation. reporting tool documentation <br /> Model analysis Staff training development <br /> 2 Employment Data and Data collection Danal snd <br /> Trend Analysis and analysis refinement <br /> Oregon Household <br /> 3 Survey--Central Lane Data collection Data analysis Data collection .Data analysis <br /> MPO (Phase I) (Phased) (Phase II) (Phase II) <br /> 4 External Cordon and Survey initiation Data collection Data processing <br /> Outline Vehicle Counts <br /> Travel Time Data and Travel time Data analysis <br /> 5 Anal sis data needs Data collection report <br /> y assessment <br /> Software <br /> 6 Regional Travel Database and application Ongoing <br /> Database Development archive design design and programming <br /> programming <br /> 2035 RTP Travel Model Model update <br /> ~ U date as needed for <br /> P 2035. RTP <br /> Coordination <br /> 8 Functional Classification with local Database <br /> Update agencies and completion <br /> ODOT <br /> Coordination Model software <br /> 9 Bicycle Model (Phase I) with Metro and and data set <br /> PSU preparation <br /> Travel Model Upgrade Project Timeline and <br /> 0 scope <br /> (Phase I) initiation development <br /> Central Lane MPO Unified Planning Work Program FI' 2010 and 2011 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.