Page 57 of 93 <br /> <br /> Transportation System Modeling and <br /> Data-Maintenance <br /> ESTIMATED TIMELINE <br /> Early Late Early Late FY <br /> Action Item Number/Title FY 2010 FY 2010 FY 201 1 201 I <br /> Model selection Model testing .Display and <br /> Land Use Allocation Final <br /> and data needs and validation. reporting tool documentation <br /> Model analysis Staff training development <br /> 2 Employment Data and Data collection Danal snd <br /> Trend Analysis and analysis refinement <br /> Oregon Household <br /> 3 Survey--Central Lane Data collection Data analysis Data collection .Data analysis <br /> MPO (Phase I) (Phased) (Phase II) (Phase II) <br /> 4 External Cordon and Survey initiation Data collection Data processing <br /> Outline Vehicle Counts <br /> Travel Time Data and Travel time Data analysis <br /> 5 Anal sis data needs Data collection report <br /> y assessment <br /> Software <br /> 6 Regional Travel Database and application Ongoing <br /> Database Development archive design design and programming <br /> programming <br /> 2035 RTP Travel Model Model update <br /> ~ U date as needed for <br /> P 2035. RTP <br /> Coordination <br /> 8 Functional Classification with local Database <br /> Update agencies and completion <br /> ODOT <br /> Coordination Model software <br /> 9 Bicycle Model (Phase I) with Metro and and data set <br /> PSU preparation <br /> Travel Model Upgrade Project Timeline and <br /> 0 scope <br /> (Phase I) initiation development <br /> Central Lane MPO Unified Planning Work Program FI' 2010 and 2011 <br /> <br />