New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4275 EWEB Revenue Contract
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2009
>
GJN4275 EWEB Revenue Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2011 1:02:15 PM
Creation date
8/21/2009 3:34:15 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004275
GL_Project_Number
975394
COE_Contract_Number
2010-00209
Retention_Destruction_Date
6/2/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Document Number: XXXXX <br /> Intergovernmental Agreement <br /> City of Eugene Contract #2010-00209 . <br /> BETWEEN:. Eugene Water & Electric Board (EWEB) <br /> <br /> i <br /> AND: The City of Eugene <br /> Water Main Replacement for Elmira Road Reconstruction Project from Bertelsen to <br /> Maple Street <br /> THIS INTERGOVERNMENTAL AGREEMENT, hereinafter referred to as "Agreement" is <br /> made and entered into by and between the Eugene Water & Electric Board hereinafter <br /> referred to as "EWEB," and the City of Eugene hereinafter referred to as "City." The City <br /> and EWEB are herein referred to jointly as the "Parties." <br /> RECITALS <br /> By the authority granted in ORS 190.010, which allows governmental. bodies to enter into <br /> agreements for the performance of any or all functions and activities that the Parties to the <br /> Agreement, their officers, or agents have the authority to perform. <br /> WHEREAS, the City is performing street reconstruction work on Elmira Road between <br /> Bertelsen Road and Maple Street and on Maple Street from Elmira Road to Roosevelt <br /> Boulevard in 2009, (referred to herein as the "Project") which is within City's right-of-way. <br /> The Project typically includes excavating of the existing road, constructing curbs, sidewalks, <br /> storm. drainage conveyance and quality treatment, replacing the road base and repaving <br /> with asphalt concrete. EWEB-has requested the City to stage construction of the Project to <br /> coordinate the storm pipe and an EWEB waterline. This will accommodate EWER work to <br /> construct an 8-inch water main installation and the associated water services, street <br /> crossings; testing and chlorination (referred to herein as the "Work")for the section of Elmira <br /> .Road between station 4+00 to 18+64Ft (approximately Hope Loop to Louis Street) by <br /> EWEB personnel and forces. EWEB will work approximately 50-100 feet behind the <br /> contractor to install the parallel water main. The City's contractor will be responsible for <br /> constructing a joint trench including a bench for the 8-inch water main, backfilling and <br /> compacting the storm pipe zone ahead of the EWEB crew. The Contractor shall also backfill <br /> and compact the waterline trench behind the EWEB crew. In addition to the water main <br /> EWEB will install service laterals where needed to service existing properties from the new <br /> water main. This work will be coordinated with the prime contractor in such a manner as to <br /> not delay the prime contractors work schedule. <br /> The Work excludes other areas on Elmira Road and Maple. Street. At these areas, EWEB <br /> will install all replacement facilities before the City construction improvements begin; <br /> NOW THEREFORE, the Parties have agreed to accomplish that work as follows: <br /> TERMS OF AGREEMENT <br /> The term of this agreement .shall begin upon its execution and continue through the <br /> completion of the work, and there after shall expire. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.