New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FY 2005-06 MWMC Budget & CIP
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
FY 2005-06 MWMC Budget & CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2009 5:00:01 AM
Creation date
8/21/2009 11:29:39 AM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Wastewater
PW_Subject
MWMC
Document_Date
6/30/2006
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i <br /> SODIUM HYPOCHLORITE CONVERSION <br /> 1 <br /> Facility Process Component <br /> DisinfectionlOutfall <br /> i <br /> $4,713,000 <br /> Total Cost <br /> i <br /> PRIOR <br /> Costs ~ EXPEND- 2005-06 2006-07 2007-08* 2008-09 2009-10 'TOTAL <br /> ITURES <br /> Construction 4,713 000 4 713,000 <br /> TOTAL 0 0 0 4 713 000 0 0 4 713 000 <br /> FUNDING SOURCE <br /> Capital Reserve 4 713 000 4,713,000 <br /> TOTAL 0 0 0 4,713,000 0 0 4,713,000 <br /> * Inflated from 2004 by 6.3% to FY05-06 dollars (Engineering News Record factor) and 4% thereafter <br /> i <br /> PROJECT: Sodium Hypochlorite Conversion <br /> DESCRIPTION: Convert existing chlorine gas system to sodium hypochlorite for the base flow. Retain the <br /> existing chlorine contact basins. Install system with capability for high rate disinfection of <br /> PE diversion assuming high dosages of chlorine into a 72-inch pipe and small chlorine <br /> contact basin. <br /> JUSTIFICATION: Liquid sodium hypochlorite and sodium bisulfate system will replace the existing chlorine <br /> sulfur dioxide gas systems and increase the disinfection capacity from 175 mgd to 277 <br /> mgd. <br /> PROJECT DRIVER: Operator and community safety issues. <br /> PROJECT TRIGGER: Phasing with other related projects. <br /> TYPE OF PROJECT: 50% Capacity; 50% Performance <br /> ESTIMATED PROJECT COST $4,100,000 s <br /> (FY 2004-05 Dollars): - <br /> INFLATED PROJECT COST $4,713,000 <br /> (FY 2007-08 Dollars): j <br /> i. <br /> j PHASING: Budgeted for FY 2007/08 <br /> i <br /> <br /> . 1. <br /> Page 73 FY OS-06 BUDGET AND CTP ' <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.