New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FY 2005-06 MWMC Budget & CIP
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
FY 2005-06 MWMC Budget & CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2009 5:00:01 AM
Creation date
8/21/2009 11:29:39 AM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Wastewater
PW_Subject
MWMC
Document_Date
6/30/2006
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
WASTE ACTIVATED SLUDGE THICKENING <br /> Facility Process Component <br /> Secondary Treatment <br /> ~ $2,657,000 <br /> Total Cost <br /> jr <br /> PRIOR <br /> Costs EXPEND- 200.5=06* 2006-07 2007-08 2008-09 2009-10 TOTAL <br /> ~ ITURES <br /> Construction 2 657 000 2 657,000 <br /> TOTAL 0 2 657 000 0 0 0 0 2 657 000 <br /> FUNDING SOURCE <br /> Capital Reserve 2,157,000 2,157,000 <br /> SDC Reimbursement Reserve 200,000 200,000 <br /> SDC Improvement Reserve 300 000 300,000 <br /> TOTAL 0 2,657;000 0 0 0 0 2,657;000 <br /> * Inflated from 2004 by 6.3% to FY05-06 dollars (Engineering News Record factor) and 4% thereafter <br /> PROJECT: Third Gravity Belt Thickener <br /> <br /> ~ " DESCRIPTION: Third ravi belt thickener GBT with associated at rade buildin .Assumes additional <br /> 9 tY ( ) 9 9 <br /> basement floor space is not required. <br /> JUSTIFICATION: Provides additional capacity for WAS thickening and potentially delays the construction of <br /> additional digesters. <br /> PROJECT DRIVER: Additional capacity to provide WAS thickening with one unit offline at WWMW upper limit <br /> flow projections. Nitrification required by the NPDES permit and increasing wastewater <br /> flows and loads generates more WAS solids. Provide ability to conduct recuperative <br /> thickening so that need for additional digestion volume can potentially be deferred. <br /> PROJECT TRIGGER: Exceeding solids and hydraulic loading rate design criteria. <br /> i_ <br /> TYPE OF PROJECT: 100% Capacity <br /> ESTIMATED PROJECT COST $2,500,000 <br /> (FY 2004-05 Dollars): <br /> INFLATED PROJECT COST $2,657,000 <br /> (2005 Dollars): <br /> ~ PHASING: Budgeted for FY 2005/06 <br /> i <br /> l:_. <br /> Pa;e 66 FY OS-06 BUDGET AND CIP <br /> . <br /> _ <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.