New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FY 2005-06 MWMC Budget & CIP
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
FY 2005-06 MWMC Budget & CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2009 5:00:01 AM
Creation date
8/21/2009 11:29:39 AM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Wastewater
PW_Subject
MWMC
Document_Date
6/30/2006
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i <br /> i <br /> j DIGESTER MIXING IMPROVEMENTS <br /> Facility Process Component <br /> Secondary Treatment <br /> $2,167,000 <br /> Total Cost <br /> i <br /> PRIOR <br /> I <br /> Costs EXPEND-. 2005<08 2006-07* 2007=08: 2008-09 2009-10 TOTAL <br /> I`i`URES <br /> Design & Engineering 150,000 50,000 200,000 <br /> Construction 1 967 000 1 967 000 <br /> TOTAL 150000 2 017000 0 0 0 0 2 167 000 <br /> FUNDING SOURCE <br /> Capital Reserve 150 000 2 017 000 2,167,000 <br /> i TOTAL 150,000 2,017;000 0 0 0 0 2,167,000 <br /> * Inflated from 2004 by 6.3% to FY05-06 dollars (Engineering News Record factor) and 4% thereafter <br /> I;' PROJECT: Digester Mixing Improvements Design and Construction <br /> DESCRIPTION: Replace existing gas mixing system with a pump mixing system. <br /> JUSTIFICATION: This project will increase the active volume of the digesters, thus allowing for additional <br /> solids stabilization volume and potentially deferring the need to construct an additional <br /> digester. <br /> PROJECT DRIVER: Need for improved digester mixing to increase active digester volume. <br /> PROJECT TRIGGER: Sludge residence time (SRT) and volatile solids reduction design criteria. <br /> TYPE OF PROJECT: 50% Capacity; 50% Performance <br /> ESTIMATED PROJECT COST $2,000,000 <br /> (FY 2004-05 Dollars): <br /> <br /> i <br /> INFLATED PROJECT COST $2,167,000 <br /> i <br /> (FY 2005-06 Dollars): <br /> PHASING: Design budgeted for FY 2004!05 ; <br /> Construction budgeted for FY 2005/06 <br /> I, <br /> i <br /> i <br /> 14 <br /> L . <br /> i' <br /> i_ <br /> i, <br /> i <br /> i <br /> i <br /> Page 65 FY OS-O6 BUDGET AND CIP <br /> _ <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.