New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FY 2005-06 MWMC Budget & CIP
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
FY 2005-06 MWMC Budget & CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2009 5:00:01 AM
Creation date
8/21/2009 11:29:39 AM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Wastewater
PW_Subject
MWMC
Document_Date
6/30/2006
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Metropolitan Wastewater Management Commission Capital Improvements Program <br /> ~ OTHER CAPITAL PROGRAMS <br /> i Equipment Replacement <br /> The FY OS-06 Capital Programs budget includes the Equipment Replacement projects identified in <br /> the table below. <br /> i <br /> Adopted Equipment Replacement Projects - FY 05-06 <br /> Project Description Adopted Budget <br /> Raw Sewage Pump (last of 4) 132,440 <br /> Recycle Pump 17,602 <br /> <br /> j Washer/compactor, Screening 23,000 <br /> Activated Sludge Pump 17,000 <br /> Boiler Upgrade 130,000 <br /> Variable Frequency Drive for W2 Pump 15,000 <br /> Programmable Logic Controller 34,706 <br /> ~I Computer Equipment 54,275 <br /> Fleet Replacement 156,110 <br /> Total $580,133. <br /> • Major Rehabilitation <br /> The FY OS-06 Capital Programs budget includes the Major Rehabilitation projects identified in <br /> the table below. <br /> Adopted Major Rehah Projects - FY 05-06 <br /> Project Description Adopted Budget <br /> I Operations Building Improvements $50,000 <br /> Wall Replacement in Screw Pump Room $22,000 <br /> Recycle Wet Well Coating $40,000 <br /> Roof Replacement, Welding Shop $30,000 <br /> Roof Replacement, South Storage Bldg $50,000 <br /> Total $192,000 <br /> Page 35 FY OS-06 BUDGET AND CTP <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.