New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4581 4610 Knife River Contract 2010-00001
COE
>
PW
>
Admin
>
Finance
>
Capital
>
09 Street Bond Audit
>
GJN4581 4610
>
GJN4581 4610 Knife River Contract 2010-00001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 11:31:31 AM
Creation date
7/27/2009 12:08:00 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004581
GL_Project_Number
995334
Identification_Number
2010050055
COE_Contract_Number
2010-00001
Retention_Destruction_Date
11/29/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TRUCK DRIVER (Continued) <br />Coos Bay Madras Salem <br />Corvallis Medford The Dalles <br />Eugene McMinnville Tillamook <br />j Goldendale Newport Vancouver <br />Zone B .65 <br />Zone C 1.15 <br />Zone D 1.70 <br />Zone E 2.75 <br />Zone A: Projects within 30 miles of the cities listed <br />above <br />Zone B: More than 30 miles but less than 40 miles. <br />Zone C: More than 40 miles but less than 50 miles. <br />Zone D: More than 50 miles but less than 80 miles. <br />Zone E: More than 80 miles. <br />Note; All job or project locations shall be computed <br />(determined) on the basis of road miles .and in the <br />following manner. A mileage measurement will start at <br />the entrance to the respective city hall, facing the project <br />(if possible), and shall proceed' by the normal route <br />(shortest time-best road) to the geographical center on <br />the highway, railroad, and street construction projects <br />(end of measurement).On all other project contracts, the <br />geographical center: where the major portion of the <br />construction is located, shall be considered the center of <br />the project (end measurement): <br />
The URL can be used to link to this page
Your browser does not support the video tag.