ROOFER (Continued) <br />**** Add $3.00 to basic hourly rate for employees <br />working with irritable bituminous materials <br />SHEET METALWORKER <br />Area 1 33.27 16.05 <br />Add $1.00 to base rate for work performed on any <br />swinging platform, swinging chair or swinging <br />ladder.. <br />Add $1.00 to base rate for work with lead or <br />installing material in a plant that uses lead in any <br />form to manufacture a product (excluding <br />soldering). <br />Add $1.00 to base rate for work performed in a <br />confined space as defined by OSHA. <br />Area 3 29.71 15.00 <br />Add $1.00 to base. rate for work where it is <br />necessary to wear a chemically activated face <br />mask. <br />Area 4 29.00 14.53 <br />Area 5 28.13 15.30 <br />Area 1 Area 1 (Cont.) Area 5 <br />Benton Washington Coos <br />Clackamas Wheeler .Curry <br />Clatsop <br />Columbia Area 3 <br />Gilliam Morrow <br />Grant Umatilla <br />Lincoln <br />Linn Area 4 <br />Multnomah Douglas <br />Tillamook Lane <br />SOFT FLOOR LAYER' 25.58 10.85 <br />SPRINKLER FITTER .32.15 16.55 <br />TENDERS TO MASON TRADES B rick and <br />Stonemason, Mortar Mixer, Hod Carrier) <br /> 25.14 11.00 <br />Add $0.50 to base rate for refractory work. <br />TENDERS TO MASON TRADES (Brick and <br />Stonemason, Mortar Mixer, Hod Carrier) <br />(Continued) <br />Add to base rate an amount equal to that received for <br />safety belt requirements , or other unusual job <br />conditions by the mechanic this worker is tending. <br />TENDER TO PLASTERER AND STUCCO <br />MASON <br />23.62 11.00 <br />TILE SETTER/TERRAZZO WORKER: Hard Tile <br />Setter 26.53 12.60 <br />(This trade is tended by "Tile, Terrazzo, & Marble <br />Finisher") <br />TILE. TERRAZZO. AND MARBLE FINISHER <br />TILE, TERRAZZO FINISHER <br />20.21 9.20 <br />BRICK AND MARBLE FINISHER <br />20.21 9.30 <br />Add $1.00 to base rate if safety belt required by State <br />safety regulations. <br />Add $1.00 to base rate if work involves epoxy, <br />furnane, alkor acetylene black grouting or waterproof <br />membrane. <br />TRUCK DRIVER <br />Group.l 26.40 11.91 <br />Group 2 26.52 11.91 <br />Group 3 26.65 11.91 <br />Group 4 26.91. 11.91 <br />Group 5 27.13 11.91 <br />Group 6 27.29 11.91 <br />Group 7 27.49 11.91 <br />(Zone Pay in addition to Basic Hourly Rate and <br />Fringe.) <br />For the Following Cities: <br />Albany Grants Pass Ontario <br />Astoria Hermiston Oregon City <br />Baker Hood River Pendleton <br />Bend Klamath Falls Portland <br />Bingen LaGrande Port Orford <br />Brookings Lakeview Reedsport <br />Burns Longview Roseburg <br />• 11' ~. .. ~ ~ 1 <br />