New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4624 CPM Dev 2009-00028
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2009
>
GJN4624 CPM Dev 2009-00028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 12:27:54 PM
Creation date
7/6/2009 12:17:58 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004624
GL_Project_Number
317017
COE_Contract_Number
2009-00028
Retention_Destruction_Date
12/24/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SPECIFICATION FOR ADJUSTMENT OF EWEB WATER VALVE BOXES <br /> 1.0 GENERAL ~ ` <br /> 1.01 SECTION INCLUDES <br /> A. Water Valve Boxes <br /> B. Valve Box Risers <br /> 1.02 REFERENCES <br /> A. EWEB Standard WC5-4.1000 -Typical Valve Box Installation <br /> B. EWEB Standard WC5=4.1100 -Typical Valve Box Retrofit-Repaving/Rotomill <br /> with Asphalt <br /> C. EWEB Standard WC5-4.1200 - Typical Valve Box Retrofit-Street <br /> Rebuild/Street Cut <br /> D. City of Eugene-Diamond Cut Sanitary Cleanout Standard RD362(A) <br /> 1.02.1 The Contractor shall make all arrangements with EWER Water Distribution to obtain <br /> all materials to complete the Work. <br /> 2.0 PRODUCTS <br /> A. Valve Boxes -EWEB will supply to the contractor all valve boxes and lids <br /> necessary to complete the Work. <br /> B. Valve Box Risers -EWEB will supply to the contractor all valve box risers <br /> necessary to complete the Work. , <br /> C. Valve Tiles Material - 8" PVC, ASTM 3034, SDR 35 <br /> 3.0 EXECUTION <br /> A. The contractor will pick up materials at EWEB's Operations yard, 500 E. 4th Ave. <br /> Eugene, Oregon, as needed. . <br /> B. Install and or adjust EWEB valve boxes, risers and lids in a manner consistent <br /> with the use of EWEB water valves, as shown in EWEB Standards WC5-4.1000, <br /> WC5-4.1100, and WC5-4.1200 to the satisfaction of EWEB. <br /> 1. Center box over the operator nut on the water valve <br /> 2. Remove debris from the valve the to allow unobstructed access to and <br /> operation of the operator taut on the valve. <br /> 3. Set top of valve box or, riser flush with the street surface. <br /> C. Report any leakage from any water valve to EWEB at 484-3766, as soon as <br /> <br /> ' possible. ' <br /> D. Mark in blue paint the exact location of any valve that is temporarily covered in <br /> the course of the project. The mark shall be a blue "V" inside a 12-inch diameter. <br /> circle at the location of the valve that was covered. <br /> 4.0 PAYMENT <br /> Payment for raising, lowering, adjusting and/or replacing EWEB valve boxes shall be <br /> payment in full for all Work required at each location, regardless of the number of <br /> separate operations performed and shall be paid for under the bid item, "Adjusting <br /> Boxes". <br /> Special Provisions -Job #4624 Page 15 of 15 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.