PUBLIC IMPROVEMENT CONTRACT FOR USE WITH <br /> OREGON STANDARD SPECIFICATIONS FOR CONSTRUCTION <br /> (SAMPLE) <br /> BETWEEN: The City of Eugene, an Oregon <br /> Municipal Corporation (City) <br /> AND: (Contractor) <br /> CONTRACT NO.: <br /> JOB NO.: 4624 • <br /> PROJECT: 2009 POTHOLE REPAIR PROJECT ON'RIVERVIEW STREET FROM E <br /> 16T" AVENUE TO FLORAL HILL DRIVE AND FLORAL HILL DRIVE <br /> FROM ADDRESSES 3087-2855; CROSS STREET FROM GARFIELD <br /> STREET TO CLEVELAND STREET • <br /> RECITALS <br /> Contractor was the successful bidder for the contract construction of the public <br /> improvement project described ~in the plans and specifications for the project that were included in <br /> the bid documents and the Oregon Standard Specifications for Construction which form a part of <br /> the Contract. <br /> AGREEMENT <br /> 1. The Contract. The Contract between the City and Contractor (the "Contract").includes this <br /> Document and its exhibits, together with all of the documents and materials included in the <br /> definition of the "Contract" under the 2008 Oregon Standard Specifications for Construction, <br /> Volumes I and II, issued by the Oregon Department of Transportation, as modified by the <br /> City's Amendments to the Specifications for Volume I (the "General Conditions"), and Volume <br /> II Supplemental Specifications for the Project and any other Special Provisions included in <br /> the Bid Documents (all specifications, plans, drawings and Special Provisions included, in the <br /> Contract are collectively referred to herein as the "Specifications"). In addition, the Contract <br /> between the City and Contractor shall•be deemed to incorporate all reports, records, laws, <br /> rules and orders referenced in the Contract documents. <br /> This Document includes and incorporates the following Exhibits: . <br /> Exhibit A -Solicitation Documents <br /> 2. Definitions. Unless otherwise specifically defined in this Document, all capitalized terms <br /> which are not proper nouns shall have the meanings assigned thereto in the Specifications. <br /> 3. Project. The project is generally described as: <br /> 2009 POTHOLE REPAIR PROJECT ON RIVERVIEW STREET FROM E 16T" AVENUE <br /> • TO FLORAL HILL DRIVE AND. FLORAL HILL DRIVE FROM ADDRESSES 3087-2855; <br /> CROSS STREET FROM GARFIELD STREET TO CLEVELAND STREET <br /> <br /> • Public Improvement Contract for Use with Oregon Standard. Specifications.-Page 1 <br /> (Revised October 2008) <br /> <br />