Finishing and Cleaning Up <br /> 00270.70 General -When temporary fences and appurtenances are no longerneeded remove and dispose of <br /> them according to tfie applicable parts of Section 00310 except fence fabric, fence wire, posts, and <br /> braces may be used in permanent fence installations if the following conditions are met: <br /> • . The material was new when installed for temporary purposes <br /> • The material has not been used on previous projects <br /> The material meets the requirements of 01050.10 <br /> • The material is undamaged, . <br /> • The material is acceptable to the Engineer <br /> 1VI asu <br /> e rement <br /> 00270.80 Fence and Gateways -The quantities of temporary fence will be measured on the length basis of <br /> each type of temporary fence. Gateways will be considered as fence of the type which adjoins <br /> them and will be measured as a continuing part of that type of fence. Measurement will be from <br /> center to center of posts, measured. along the line and grade of each separate continuous run of <br /> fence as constructed exclusive of gates. <br /> Payment <br /> . 00270.90 General -The accepted quantities of temporary fences and temporary gates will be paid for at the <br /> Contract price, per unit of measurement, for the following items: <br /> Pay Item ~ ~ Unit of Measurement <br /> (a)Temporary Type Orange Plastic Mesh Fence Foot 1 <br /> Payment will be payment in full for furnishing, placing, maintaining, and removing all materials, <br /> performing all necessary earthwork, and for furnishing all equipment, labor, and incidentals <br /> .necessary to complete the work as specified. <br /> 00280.90 Payment <br /> (Add) To the list of items included in the paragraph that begins "Items (g), (n) and (o)" the following: <br /> "compost filter berm.'.' <br /> 00759.80 Measurement <br /> (Add) Measurement ofReverse Curb and Gutter will be by length along the. face of the structure. Where <br /> there is a transition between standard Curb and Gutter and Reverse Curb and Gutter,. the transition <br /> length will be included in the reverse curb and gutter measurement. <br /> CI3ANGES TO PLANS <br /> (Replace) Sheets 2B, 2B-2, 2B-3 and 2B-4 with the attached revised sheets dated 5/12/09. <br /> (Add) Sheet titled "Permanent Sign & Post Data Table" to the plan set as sheet 25. <br /> (Revise) On Sheet 3, the length dimension of 24" Storm Drain Pipe from MH #59446 to #84529 to read <br /> 11.8.7'. <br /> (Revise) On Sheet 5, the 24" Storm Drain Pipe from MH #84529 to #84530 to be 18" Storm Drain Pipe <br /> and the length of pipe to read 238.8'. <br /> (Revise) On Sheet S; the length dimension of 6" Wastewater Pipe to the east at MH# 18891 to read 23.8'. <br /> <br /> Addendum#1 -Job #3923 Page 3 <br /> <br />