New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN3923 Babb/Delta 2009-00027
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2009
>
GJN3923 Babb/Delta 2009-00027
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2011 10:52:10 AM
Creation date
6/23/2009 4:51:12 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
003923
GL_Project_Number
935034
COE_Contract_Number
2009-00027
Retention_Destruction_Date
6/2/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Public Works <br /> Engineering <br /> City of Eugene <br /> 99 East Broadway, Suite 400 <br /> Eugene, Oregon 97401 <br /> ADDENDUM NO.1 (541) 682-5560 <br /> (541) 682-8410 FAX <br /> TO TIDE CONTRACT DOCUMENTS AND SPECIFICATIONS FOR <br /> CHAD DRIVE EXTENSION FROM THE EAST END OF CHAD DRIVE TO NORTH GAME <br /> FARM ROAD, FEDERAL PROJECT #STP-2385(0560) <br /> May 12, 2009 JOB #3923 BID NUMBER 13 <br /> <br /> 1 <br /> i <br /> TO ALL PLANHOLDERS: <br /> The following changes shall amend and supplement the project bidding documents only to the extent specifically <br /> shown and noted. All other conditions shall remain the same. <br /> Bidders shall incorporate the effects of these changes in the appropriate bid items included in this addendum and <br /> the total of these bid items then add in the appropriate place on the bid form. . <br /> CHANGES TO BID SCHEDULE: <br /> (Delete) Original Bid Schedule dated 04/24/2009 <br /> (Add) Revised Bid Schedule dated 05/12/2009 <br /> CHANGES TO SPECIAL PROVISIONS: <br /> 00165.10(a) Materials Acceptance Guides -Field Tested Materials <br /> (Delete) At the end of the first sentence, "at the discretion and frequency determined by the Engineer" <br /> (Add) "pursuant to the.Eugene Field tested Materials Assurance Guide (Eugene FTMAG). Additional <br /> testing maybe conducted as determined by the Engineer." - <br /> 00165.10 Materials Acceptance Guides -Changes to the MFTP <br /> Section 2: Quality Assurance Program <br /> (Delete) At the beginning of the second sentence of the first paragraph, delete the words "At the Engineer's <br /> ,discretion,". <br /> (Delete) At the end of the last sentence of the first paragraph, delete the words "at the discretion of the <br /> Engineer and at times and locations determined by the Engineer." <br /> (Add) At the end of the last sentence of the first paragraph, insert "pursuant to the Eugene FTMAG. <br /> Additional testing may be conducted as determined by the Engineer." <br /> (Delete) Section 4(D): Field Tested Materials Guide. The entireparagraph in the Amendment. <br /> (Add) Section 5: Field Tested Materials Guide (Type D & E Projects) <br /> Contractor shall comply with-the requirements of Section 5 Quality Control for Type D Projects. <br /> Addendum #1 -Job #3923 Page 1 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.