Mr. Patrick Cox <br /> May 29, 2009 r ~ CNNSNlTING <br /> ENGINEfflS <br /> .Page 2 <br /> complete the tasks as outlined above. At this time OBEC estimates this scope of work can be <br /> completed on a time and material basis for an amount not to exceed $5,100, based on the <br /> schedule of fees in City of Eugene/OBEC <br /> pool contract #2005-00212, Amendment Five. <br /> Schedule <br /> It is our understanding that the City would like to deliver the engineered vault cover drawing to <br /> the Contractor as soon as practical. OBEC is prepared to complete our work within three weeks <br /> of notice to proceed, including review of the preliminary design by the City prior to completing <br /> the drawing. <br /> We hope this proposal provides the City with the information required at this time. Please do <br /> not hesitate to call if you have any questions or need additional information. <br /> Sincerely, <br /> Gary E. ayor, P.E., S.E. <br /> Principal Engineer <br /> <br /> GER:vks <br /> <br /> Enclosures <br /> City of Eugene Contract #2009-00267 <br /> Exhibit B -Scope of Work <br /> Page 2 of 3 <br /> <br />