9~'" <br /> <br /> ,Run Date: 6/5/2009 Page 1 of 2 <br /> City of Eugene <br /> Bid Tabulation <br /> Bid #2009-000018 <br /> Job No. 93-004602 - <br /> PBM AMAZON PATH REHABILITATION PROJECT FROM 19TH AVENUE TO 31ST AVENUE <br /> Engineer's Estimate ~ KSH Construction McKenzie Excavating ~ Babb Construction <br /> Line <br /> No. Description uantit Unit Unit Price. Amount Unit Price Amount Unit Price Amount e Unit Price Amount <br /> 10 MOBILIZATION l LUMPSUM $35 000.00 $35 000.00 ' $33.815.25 $33 815.25. $14 200.00 $14 200.00. $31 608.75 $31 608.7.5 <br /> 20 CONCRETE MULTI-USE PATH 7" 44000 - S FT $5.00 $220 000.00 $3.30 $145 200:00 ~ .$3.25 143 000.00 $3.05 '$13.4 200.00 <br /> Q $ <br /> 30 COMPOST FILTER BERM 4700 FOOT $4.00 $18,800.'00 $2.00 $9,400.00 ~ $1.67 $7,849.00 ~ $2.25 $10,575.00 <br /> 40 EROSION CONTROL l LUMPSUM $1,000.00 $1,000.00 $3,000.00 $3,000.00 $2,760.00 $2,760.00 ! $1,600.00 $L, 600.00 <br /> 50 TOPSOIL 400 CUYD $60.00 $24,000.00 $21.00 $8,900.00 i $21.55 $8,620.00 1 .$21.00 $8,900.00 <br /> 60 TEMP. WORK ZONE TRAFFIC CONTROL, COMPLETE 1. LUMPSUM $2,500.00 $2,500.00 $5,000.00 $5,000.00 ~ $10,190.00 $10,190.00 $15,402.00 <br /> $15,402.00 <br /> 70 CITY PROVIDED SPEC ,INFO SIGNS 9 EACH $300.00 $2,700.00 $175.00 $1,575.00 ~ $73.33 $659.97 ~ $100'.00. $900.00 <br /> 80 LEVEL 1 12 <br /> / DENSE HMAC 80 TON 70.00 5 600.00 90.00 7 200.00 ~ 102.95 8 236.00 140..00 11 200.00 <br /> 90 BASE, AGGREGATE 2400 TON $30.00 $72,000 00 $18:20 $43,680.00 ~ 521.68 $52,032.00 ~ $17.50 $42,000.00 <br /> 100 CONSTRUCTION FENCE, ORANGE 5000 LINFT $2.50 $12,500 00 ~ $1.20 $6,000.00 $0.99. $4,700.00 $2.50 $12,500.00 <br /> 110 TEMPORARY 6' CHAIN-LINK FENCE 1180. LINFT $5.00 $5,,900.00 i $1.70 $2,006.00 ~ $3.87 $4,566.60 $3.50 $4,130.00 <br /> 120 SOD LAWN 2050 SQFT $1.00 $2,050.00 ~ $1.50 $3,075.00 $1.00 $2,050.00 ~ $0.50 $1,025.00 <br /> 130 REMOVAL OF SURFACINGS 5145 SQYD $10.00 $51,450 00 ~ $6.50 $33,492.50 $5.66 $29,120.70' ~ $8.50 $43,732.50 <br /> 140 CURB REMOVAL 96 LINFT $5.00 $480.00 $3.00 $288.00 ~ $3.75 $360.00 { $2,00 $192.00 <br /> 150 CURB & GUTTER, REPL 96 LINFT $15.00 $1,440.00 $31.00 $2,976.00 i $28.89 $2,768..64 $29.00 $2,784.00 <br /> 160 SAW CUTTING,,CONCRETE 650 LINFT $3.00 $1,950.00 i $4.00 $2,600.00 ~ $3.98 $2,262.00 $3.25 $2,112.50 <br /> 170 SAW CUTTING, A/C 225 LINFT $3.00 $675.00 $0.85 $191.25 $1.57 $353.25.. I $1.00 $225,00 <br /> 180 IRRIGATION - SLEEVING - FUTURE 224 FOOT $5.00 $1,120 00 $5.00 $1,120.00 $10.56 $2,365.44 i $4.75 $1„064.00 <br /> 190 CONCRETE CURTAIN WALL/GRADE BEAM 3135 LINFT $15.00 $97,025 00 $6.50 $20,377.50 ~ $13.21 $41,913.35 $11.00 $34,:485.00 <br /> 200 CONCRETE CURTAIN WALL/GRADE BEAM RETROFIT 588 LINFT $25.00 $14,700 00 ~ $41.00 $29,108.00 ; $29.26 $17,204.88 $41.25 $24,255.Ob <br /> 210 PVMT LINE, CROSSWALK AND STRIPING 263 SQFT $4.00 $1,052.00 ~ $8:50 $2,235.50 $7.23 $1,901.49 ~ $.8.50- $2,235.50 <br /> . <br /> 220 DOWEL BARS 3/4"x18" 155 EACH $20.00 $3,100 00 $19.00 $2,945.00 $5.70 $883.50 $18.25 $2,828.75 <br /> 230 TRUNCATED DOME TEXTURING 72 .SQFT $30.00 $2.,160.00 ~ $16.50 $1,188.00 $21.03 $1,514.16 $16.00 $1,152.00 <br /> 240 REMOVE & REPLACE 6" CONCRETE STM PIPE 28 LINFT $25.00. $700.00 ~ $35.00 $,980.00 $34.29 $960.12 j $21.00 $588.00 <br /> 250 IRRIGATION SYSTEM 1 LUMPSUM $500.00 $500.00 E $500.00 $:500.00 $610:0.0 $610.00 ( $500.00 $500.00 <br /> 260 REMOVE EXISTING SIGNS 1 LUMPSUM $250.00 $250.00 t $250.00 $250.00 $440.00 '$440.00 $225.00 $225.00 <br /> 270 .TYPE. Wl SIGNS IN PLACE 33 SQFT $20.00 $660.00 ~ $11.00 $363.00 $20.17. $665.61 $18.00 $594.00 <br /> 280 WOOD SIGN POSTS 3 EACH $150.00 $950.00 ~ $100.00 $300.00 $86.67 $260.01. $50.00 $150.00 <br /> 290 SQUARE TUBE SIGN SUPPORT 1 .EACH $200.00 $200.00 i $150.00 $150.00 $321.00 $321.00 $150.00 $150.00 <br /> 300 PERMANENT SEEDING, CITY PROVIDED SEED 2 LUMPSUM $500.00 $1,000.00 j $2,000.00 $4,000.00 .$3,473.00 $6,946.00 $4,000.00 $8,000.00 <br /> GRAND TOTAL: $530,962.00 ~ $366,366.00 $369,213.72 <br /> $398,814.00 <br /> <br />