'`„ <br />Ezhibit A <br />to <br />Standards for Traffic Impact Analysis <br />Administrative Rule R-9.8650 <br />Traffic Impact Analysis/Traffic Impact Study Format <br />Address <br />Land Use Application # <br />Project Description: Project Name <br />Map/Tax Lot # <br />Site Size (s.f.) <br />Existing Access(es)-# and width <br />Building Permit # <br />Land Use <br />Horizon Year (full buildout) <br />Analysis Period: <br />Weekday PM Peak <br />Weekday AM Peak <br />Weekday Noon Peak <br />Saturday 2PM Peak <br />Other <br />Trip Generation Requirements <br />Trip Distribution Requirements <br />Scope of Analysis or Study (Software required, background traffic growth factors, etc.) <br />Intersections to be analyzed: <br />1. <br />2. <br />3. <br />4. <br />5. <br />Traffic Signal Warrant Analysis Required? Yes No <br />Special Requirements of Study (Truck turning radius diagrams, internal circulation <br />analysis, driveway stacking and operations, movement restrictions, median treatment) <br />Accident Study/Collision Diagram Required: <br />Date <br />17A/flSFormatwpd2002 <br />