New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Admin Order 58-02-04 (2)
COE
>
PW
>
Admin
>
Execs
>
Admin Orders
>
Admin Order 58-02-04 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2009 9:19:29 AM
Creation date
6/4/2009 10:11:28 AM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Admin Orders
PW_Subject
POS
Document_Date
9/4/2002
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2.1 Methodology <br />The stakeholder outreach process included an extensive effort to engage the River Road <br />community, including these workshops and public involvement methods. <br />• Public Workshop #1 - February 15: attended by 105 participants who generated 112 comments <br />recorded on index cards addressing Rasor Park's physical character, benefits and satisfactions, <br />issues and concerns, desired uses and activities, and planning goals. 61 comments sheets were <br />returned at the end of the workshop and were tabulated according to topic. <br />• Community SurveX: 1100 surveys were mailed in the spring to residents living within 1/4 mile <br />of the park (the primary service area for a neighborhood park). 172 surveys were returned (16%). <br />The survey asked which uses were considered important for planning the park, activities that <br />users currently participate in, how far respondents live from the park, and respondents' age. <br />Results were compiled and tabulated. <br />• Correspondence: Friends of Rasor Park distributed a postcard survey with six master plan <br />themes; 71 postcards were returned. Additionally, there were a number of personal letters <br />submitted by the public. <br />• Personal Interviews: Personal interviews were conducted by the consultant with key <br />stakeholders including steering committee members of Friends of Rasor Park, the organizer of <br />the River Road Cruise-in, a former city park planner, city planning, park planning, and <br />transportation staff. <br />• Public Workshop #2 -June 28: attended by 80 participants who responded to the Framework <br />Plan and proposed design concept, with 37 specific review comments returned at the end of the <br />meeting and recorded by topic. <br />• Public Workshop #3 -September 13: attended by 65 participants who responded to the revised <br />design concept and 24 implementation strategies with 29 specific review comments returned at <br />the end of the meeting and recorded by topic. <br />2.2 Stakeholder Participation Findings <br />These findings represent analysis and distillation of the results of the public outreach efforts that <br />formed an underlying planning theme for the project. It is emphasized that all of these themes <br />remained consistent throughout the planning process, except for interest in continuing the River <br />Road Cruise-in (a car show, which had become a major event in the park over the last decade). <br />Notably, at the first workshop some support was expressed for the car show; however, this <br />support did not continue through the second and last workshop. <br />Rasor Park Master Plan 5 City of Eugene, Parks Planning <br />
The URL can be used to link to this page
Your browser does not support the video tag.