New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Admin Order 58-02-29-F (2)
COE
>
PW
>
Admin
>
Execs
>
Admin Orders
>
Admin Order 58-02-29-F (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2009 9:29:00 AM
Creation date
6/4/2009 9:35:23 AM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Admin Orders
PW_Subject
ROW
Document_Date
2/18/2003
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
within the Utility and Right-of--Way Permits Construction Within and Use of the Public Way Policies and <br />Procedures Manual, and other applicable documents. <br />'~. Additional Fees: <br />Failure to maintain "approved plans" on work site at all times: $100 per occurrence. <br />Deviation from "approved plans" without prior authorization of the Utility Inspector: $500 per <br />occurrence: <br />Failure to obtain a Utility Right-of--Way Use Permit prior to commencing a work activity requiring <br />the said permit will result in a fee assessment equal to twice the original permit fee without the <br />benefit of any joint trench fee reduction. <br />V. Notes: <br />1. Projects greater than 2000 ft. in length will be charged the appropriate permit multiples equal to the length <br />of activity. <br />2. Costs designated are for each facility within the joint trench.. <br />3. The option of applying for an annual blanket permit is only available to providers franchised or licensed by <br />the City. Those providers have the option of obtaining individual right-of--way cut permits for each <br />excavation activity performed within the right-of-way or obtaining an annual blanket permit which covers <br />many activities associated with maintenance and minor installations within the right-of--way. The <br />regulations pertaining to the annual blanket permit program aze contained within Section 2-B of the Utility <br />and Right-of-Way Permits Construction Within and Use of the Public Way Manual adopted by <br />Administrative Rule R-7.302-A. <br />4. Individual Permit Costs for collector streets and alleys are charged the same as local streets. <br />5. Individual Permit Costs for Public Utility Easements (PUE) abutting street right-of--way shall be chazged <br />at the same rate as if the placement had been in that right-of--way. PUEs not abutting street right-of--way <br />shall be charged at the rate for local streets. <br />VI. Other: <br />Exception permit for cutting street less than five years old: $1,000. <br />Exhibit A - 2 <br />C:\W INDO WS\TEMP\02utilmwexawpd(02/06/03) <br />
The URL can be used to link to this page
Your browser does not support the video tag.