Describe the long-term (35 year multiple objective capital improvement program <br />(including water quality, flood control and sw-related natural resources projects as <br />well as stream corridor acquisitions) and proposed new development standards that <br />would, together and along with the other multitude of activities in the stormwater <br />program, address the identified problems and opportunities; and <br />Describe the City's drainage criteria for design of stormwater system improvements. <br />E. The drainage criteria for design of stormwater system improvements contained in the <br />Basin Plans, and other specific information about design storm events and analysis and design <br />methods serve as guidance to the City and the public and are neither requirements nor prohibited <br />conduct. <br />NOW, THEREFORE, <br />The Executive Manager of the Public Works Department of the City of Eugene orders <br />and directs that: <br />1. The Eugene Stormwater Basin Master Plans (Basin Plans) are hereby approved, and <br />shall be utilized by staff of the Public Works Department in lieu of the 1990 Otak Areawide <br />Drainage Master Plans in evaluating development proposals.. The Basin Plans shall not be used as <br />approval criteria. <br />2. Copies of this Order shall be forwarded to all Public Works Department Division <br />Managers. <br />Dated this 14 day of A rn i 1 , 2003. ~ ,~~ <br />~~.. <br />Kurt A. Co <br />Executive M ages <br />Public Works Department <br />Administrative Order - 2 <br />C:\TEMP\03 coreybas in.wpd(04/03/03) <br />