New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Admin Order 58-96-02 (2)
COE
>
PW
>
Admin
>
Execs
>
Admin Orders
>
Admin Order 58-96-02 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2009 10:07:51 AM
Creation date
6/3/2009 9:45:51 AM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Admin Orders
PW_Subject
Traffic Controls
Document_Date
1/22/1996
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Administrative Order <br />of the . <br />Traffic Engineer of the City of Eugene, Oregon <br />Establishing Two-Way Traffic <br />on Washington Street between 5th Avenue and Clark Street <br />Criteria for Administrative Action <br />The administrative action of the Traffic Engineer of the City of Eugene, Oregon, establishing two- <br />way traffic on Washington Street between 5th Avenue and Clark Street is based on the following <br />criteria: - <br />(a) Traffic engineering principles and traffic investigations: <br />• Roadway and intersection capacity: two-way operation will not cause <br />capacity problems on the roadway or at any of the intersections: <br />• Safety: In the six years from 1989 through 1994, there were 17 reported <br />accidents on Washington Street between 5th .Avenue and Clark Street. <br />' Thirteen of the accidents occurred at Sth Avenue. The two-way operation <br />may result in a slight increase in traffic accidents, as it requires motorists, <br />bicyclists, and pedestrians to observe traffic. coming from two directions. <br />Traffic conditions and accidents will be monitored to determine if any <br />changes are necessary to increase the safety of the two-way street. <br />• Transit: Two-way operation will increase possible transit options. <br />- •. Traffic signs, markings and signals: Motorists will be informed of changes <br />with appropriate signing.. Signs, markings and signals will be added, _ <br />removed, or modified as needed to comply with the Manual on Uniform <br />- Traffic Control Devices. <br />• Intersection Control: Traffic signal controls will be added to the traffic <br />signal at Sth~venue for southbound Washington Street traffic. At 1st <br />Avenue, the"existing east-west stop controls will be changed to north-south <br />controls. At Clark Street, the existing Stop control for westbound Clark <br />Street will be retained and the Stop control for southbound Washington <br />,Street traffic will be removed. <br />• Railroad crossing: Southern Pacific will move the crossing gate at the <br />southwest corner of the crossing to the northwest corner. <br />
The URL can be used to link to this page
Your browser does not support the video tag.