New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Admin Order58-96-06-F-1
COE
>
PW
>
Admin
>
Execs
>
Admin Orders
>
Admin Order58-96-06-F-1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2009 10:51:35 AM
Creation date
6/3/2009 9:44:03 AM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Admin Orders
PW_Subject
SDC
Document_Date
5/8/1996
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~- Q ~ ~ Attachment #4 of Exhibit A <br />~ Administrative Order No. 58-96-06 <br />Page 5 of 5 <br />- ~ <br />2.2.3 Large Volume Users with wastewater discharge greater than 100,000 <br />gallons per day <br />For existing development with measured or proposed to#al flow greater than <br />100,000 gallons of water discharged per day, the regional wastewater charge is <br />equal to the total amount of water being discharged per day (Total Flow), divided <br />by the presumed .continuous EDU flow estimate, multiplied by the rate for one <br />EDU. The presumed continuous EDU flow estimate (average gallons per day) <br />represents the assumed daily flow of a typical EDU, if continuous consumption <br />were to occur over a 24 hour period. The presumed continuous flow measurement <br />is estimated at 600 gallons per day. The SOC charge will be based on the greater <br />of calculations using either the City methodologies or the current MWMC <br />Equalization Fee charge as directed by the MWMC Commission-approved <br />methodology applicable to proposed new development. <br />2.3 Administrative Charge <br />A further adjustment to the base equalization charge is the addition of administrative <br />costs. MWMC will incur staff costs for the updating and processing of the charge. These <br />costs would be applied on a per connection basis. The administrative cost per permit is <br />calculated, based on estimated administrative costs and future connections. Calculation <br />~- of the Regional Facility Equalization Charge is illustrated in Figure 6. <br />~- <br />July 01, 1996 Methodologies: City of Eugene Page D-fi.2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.