New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Admin Order 58-96-09 (2)
COE
>
PW
>
Admin
>
Execs
>
Admin Orders
>
Admin Order 58-96-09 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2009 10:09:00 AM
Creation date
6/3/2009 9:42:08 AM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Admin Orders
PW_Subject
Traffic Controls
Document_Date
5/15/1996
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~„ .. <br />,~ _~ <br />i <br />sg~3'~-t.~1 <br />Administrative Order <br />of the <br />Traffic Engineer of the City of Eugene, Oregon <br />Removing Parking on and Widening <br />Jefferson Street between 12th Avenue and 13th Avenue <br />The Traffic Engineer of the City of Eugene finds that: <br />A. The Eugene Code provides thatthe City Manager or the manager'-s designee shall <br />exercise specific traffic duties by administrative action, including: <br />- Implementing ordinances, resolutions, and motions of the Council <br />and his or her own orders by installing traffic control devices; <br />- Altering traffic control areas and traffic control devices including; <br />• Traffic control signals, signs, and pavement markings, <br />• Crosswalks and traffic lanes, <br />• Intersection channelization, and - <br />• Parking, areas; and <br />B. .The May 1994 Lane County Fairgrounds Master Plan recommends that Jefferson <br />Street at i3th Avenue be a major gateway into the Fairgrounds; and <br />C. An new entrance road into the Fairgrounds, located'south of 13th Avenue at <br />Jefferson Street, will be built before the beginning of the Lane County Fair on <br />August 18, 1996; and <br />D. Access Engineering Inc. evaluated the proposed Jefferson Street entrance into. the <br />Fairgrounds in its May 1996 report Fairgrounds Traffic Study, The study <br />contains existing and projected PM peak hour Level of Service at the 13th Avenue <br />- Jefferson Street intersection for the scenarios listed below; and: <br />3~ Level of Service <br />Scenario ~ 1996 20 i 5 <br />Existing Lanes. - no Fairgrounds event D E <br />Existing Lanes -small Fairgrounds event E F <br />Add third southbound lane -small Fairgrounds event ~ D E <br />~~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.