TABLE 8-1 <br />Regional_Wastewater. Systems Development Charge Analysis <br />Total Assets' $183;186,637 <br />Total Liabilities ($127,231,040 ) <br />Local Equity (net assets) l $55,955,598 <br />System Capacity (potential EDUs) 169,145 <br />Base Charge per EDU - $331.00 <br />Administration charge per permit { $55,955,598 / 169,145 = $330.80 rounded j $10.,00 <br />2. Regional .Wastewater SDC Rates For All New Development <br />Regional Wastewater SDCs For New Single Family Dwellings and Duplex <br />:.Development <br />For all'new single family dwellings, the regional wastewater SDC collected is equal <br />to; the rate for one EDU. For all new duplex developmert, the regional wastewater <br />SDC is equal to two times the EDU. <br />_. <br />Regional Wastewater SDCs For All Other'New Development with Annual <br />Average Daily Flow less than 100,000 Gallons <br />For all other new development with proposed annual average. daily flow less than <br />..100,000' gallons of water discharged,' the: regional wastewater SDC is collected <br />-based on the rate. per plumbing fixture unit multiplied by'the .number of plumbing..- <br />fixture .units in the proposed development. <br />Regional- Wastewater SDCs For All Other New Development with Annual <br />Average Daily Flow Equal to or Greater than 100,000 Gallons <br />For all other new development with proposed annual average daily. flow equal to or <br />'greater than 100,000 gallons of water discharged, the regional wastewater SDC <br />collected is equal to the annual average daily amount of water discharged, divided <br />by the EDU standard 200 gallons per day, multiplied by the rate for one EDU, The <br />regional wastewater SDC charge will be based on the greater of calculations using. <br />either the City methodologies or the current MWMC Equalization Fee charge.. <br />Exhibit B to Administrative Order No. 58-97-02-F-1 <br />