TABLE 2 <br />.Potential Impact Reduction and Credits for Systems Development Charges <br />**NOTEe List of examples; eligibility depends on compliance with criteria in SDC Policies and <br />Procedures document. <br />1. Transportation <br />REDUCTIONS: <br />Successful bus pass program for employees <br />(:REDITS: <br />Residential- <br />Street widths > 36 Feet <br />CommerciaUlndustrial: <br />Street widths > 44 feet <br />Off-site, non-contiguous intersections for arterial and collector streets- <br />Transit shelter and pullout <br />Street lights on arterial and collector streets <br />Off-site right of way and easement acquisition <br />Traffic signals <br />Off-street bicycle paths identified in TransPlan or other City plans <br />Offsite public improvements where equivalent assessments can be collected <br />2. Wastewater System <br />CREDITS: <br />Public Wastewater collection lines > 8-inch diameter <br />Public pump stations and pressure lines that serve more than the development <br />Offsite public sewer improvements, where equivalent assessments can be collected <br />3. Stormwater <br />REDUCTIONS: <br />Retention system (e.g. Drywells, infiltration trench) <br />CREDITS: <br />Stormwater collection lines > 24-inch and <_ 60-inch in diameter <br />Major drainage channels: construction and off-site easement <br />Offsite public improvements where equivalent assessments can be collected or that benefit existing <br />4. Parks System <br />CREDITS: <br />Land dedication (for sites accepted by City, consistent with adopted City Plans) <br />Onsite park facility dedication (for improvements accepted by City, consistent with adopted City'Plans) <br />May 1, 1997 City of Eugene SDC Methodology 'Page 15 <br />